Title Page
-
Site Name
-
Conducted on
-
Prepared by
-
Location
-
SWARCO Inspector:
-
Date:
-
SWARCO Personnel:
-
Subcontractors:
-
Client:
-
Intake Equipment:
-
Is the service cable in good condition?
-
Is the service cable adequately supported?
-
Is the fuse carrier & Meter sealed?
-
Is the service head in good condition?
-
Are the meter tails adequately supported?
-
Are the meter tails less than 3m long?
-
Are the tales protected solely via the DNO Fuses
Solar PV:
-
Isolator present to isolate PV from public supply?
-
Warning label to show 2 sources of supply?
-
Are the AC & DC isolators in good condition?
-
Is there a single-line diagram showing the installation?
-
Are all cables correctly supported?
TT / Earthing:
-
Is the earthing conductor suitable? (Copper Rod / Tape)
-
Is the termination to earth electrode protected against corrosion?
-
Is the termination to earth electrode reliably secured?
-
Is TT Earthing Required for this install?
-
Is the earthing connection label fitted at the electrode?
-
Is the earthing connection label fitted at the MET?
-
Is the earthing connection label fitted at cross-bonding locations?
-
Is the MET / Earth bar in good condition?
Feeder Pillar:
-
Is the consumer unit fixed correctly?
-
Is the lid to the consumer unit fitted correctly?
-
Are all the blanks fitted?
-
Is the top of the consumer unit rated to IP4X?
-
Is the side & bottom of the consumer unit rated to IP2X?
-
Are rubber closed grommets used? Can they be removed to allow access to live parts without the use of a tool?
-
Are the blanks fitted tight and correctly fitted?
-
Is the consumer unit in good condition?
-
Does the RCD trip when the test button is used?
-
Are the circuits correctly labelled?
-
Is the RCD Test notice present?
-
Is the next inspection label present?
-
Is there a Circuit schedule?
-
Are the cable ducts sealed to prevent rodent entry?
-
Is the feeder pillar locked?
Chargers:
-
Are the chargers correctly fixed?
-
Are the chargers Level?
-
Are the chargers operational?
-
Are the chargers in good condition?
-
Are the chargers identified?
-
Are Barriers / Wheel stops installed?
-
Are the chargers accessible?
Car Park:
-
Is the area clear from construction debris?
-
Are the bay lines installed?
-
Are the spaces the correct size?
-
Is the tarmac/concrete from trenching level with the finished surface?
-
Is all signage installed?
Touch Potential (Not required if o-pen device is used)
-
Is any street furniture located within 2m of the charger? (fed via another power source than the charger)
-
Is any street furniture located within 2m of the Feeder Pillar? (fed via another power source than the charger)
-
Is any street furniture located within 2m of the EV whilst on charge? (fed via another power source than the charger)
-
Are there any other exposed conductive parts or extraneous conductive parts within 2m of the charger?
-
Are there any other exposed conductive parts or extraneous conductive parts within 2m of the Feeder Pillar?
-
Are there any other exposed conductive parts or extraneous conductive parts within 2m of the EV Whilst on Charge?
Site Photos
-
Photo of whole install
-
Photo inside of feeder pillar
-
Photo inside charger (Showing connections)
-
Photo inside DB
-
Photo of Signage
Certification
-
Has the correct certificate been provided? (EIC / Minor Works)
-
Is the Client & Site address correct?
-
Is the correct installation listed E.G. 2 X Raption 150s (Not 2 X EV Chargers)
-
is the correct new installation/addition to the existing install listed?
-
Is the Regulation amendment date correct on the certificate?
-
is the correct earthing system ticked?
-
is the nature of the supply parameters & protective device completed in full? (No N/A should be listed in any of these boxes)
-
Is the maximum demand listed?
-
is the main protective conductors completed correctly?
-
Are the R1+R2 readings calculated? These should not be calculated unless cables are installed within a DSEAR / ATEX area:<br><br>The R1+R2 should be around the calculated figure but are unlikely to all be the exact calculated figure, to calculate the figure find the ZE of the site (normally on page 1 within the supply details section) then<br>minus the ZS value of the circuit, normally shown on the 4th box from the right on the results page. ZE‐ZS= R1+R2.
-
Are all signatures correct?
-
Are all test results correct & comply with BS7671
-
Signed:
-
Date: