Information

  • Site conducted

  • Audit Title (job number)

  • Client / Site

  • Conducted on

  • Inspected by

  • Location

Site Inspection

  • Has dial before you dig been requested

  • Is the structerre site classification report attached

  • Is verge permit required - eg shed, toilet, material storage. Provide details

  • Is a repeg needed

  • Nails in boundary footing required

  • Is a second inspection required

  • Site photo

  • Date

Site General

  • Appearance of soil

  • Could hard digging be required

  • Visible boundary pegs

  • Comments

Existing Fencing & Retaining

  • Fence condition rear

  • Fence condition right

  • Fence condition left

  • Fence condition front

  • Fence condition down driveway (strata lots)

  • Can any proposed retaining be built on the boundary line as drawn

  • Will anything on the adjoining lots effect building on the boundary

  • Will works adversely (major) affect adjoining land owners - eg chemical injecting, major undermining of neighbouring lots. Provide details

  • Is a BA20 form required - adversely affecting neighbouring lots

  • Do any sections of the fencing need to be removed for boundary walls or retaining. Provide details

  • Will we have to access adjoining land. Eg temp fencing placement due to fence removal. Provide details

  • Is a BA20A form required - fence removal or access of land

  • Is there a dilapidation report required

  • Other/Note

Existing Street Features

  • Footpath condition

  • Kerb condition

  • Kerb

  • Existing crossover and verge condition - note appearance

  • Does the existing crossover need to be removed. Provide details

  • Street trees

  • Street signs/power/light poles

  • Other/Note

Items to take into account prior to construction

  • Items to be removed prior to construction

  • Photo

  • Other/Note

Location of services

  • Storm water drainage plan to be confirmed by drafting

  • Power dome

  • Water location

  • Sewer junction

  • Telstra pit

  • Water tank required

  • Will water meter be in the way of paving

  • Will the sewer I.O be located in way of paving

  • Does paving need to be removed to install services

  • Is there anything obstructing easement

  • Other/Note

Site Access

  • Clear vehicle access

  • Strata lot

  • Is a access track required

  • Sufficient material storage area

  • Is there height restrictions

  • Is there enough street parking for brick & roof tile deliveries

  • Will there be issues with a concrete truck gaining access

  • Is a concrete pump required for footings due to site difficulties? If yes, explanation must be stated. (Note: pump for footings over 8m3 to be included).

  • Other/Note

Site safety

  • Overhead power lines

  • Is tiger tail protection required

  • Is temporary fencing required

  • Is traffic control needed

  • Will a safety rail to the lower roof be required if the drop is over 3m within 2m of the edge of gutter- this includes lower levels on the other side of the fence/retaining

  • Will handrail or scaffold be required to any fall zones (retaining walls) if there can be a potential fall of 3m or 2m if on scaffold in working areas. Provide details

  • Access

General comments

  • General Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.