Title Page

  • Conducted on

  • Prepared by

  • Site Address

Odour Management

  • Confirm Wind Direction and Strength (Low-Med-High) in Notes Section

  • Enter Odour Level on Site

  • Bin Lids shut on bins used for storage

  • Is the site Odour Management Plan being complied with

Yard Area (including car parking areas and boiler areas (if applicable))

  • Is the housekeeping of all areas of the Yard acceptable

  • Is the housekeeping of the Fence Line acceptable

  • Is all visible drainage on site free from obstruction

  • Is the Building Structure acceptable

  • Are the compactor skips stored in yard suitable for road transport

  • Fuel Tanks and Bunds

Plant Area

  • Is the Fridge Operational

  • Are all anatomical wastes onsite placed in the fridge

  • Spill Control / Spillage Kit Available

  • Is the housekeeping around the compactor unit acceptable

  • Is the housekeeping around the autoclaves/rotoclaves acceptable

  • Autoclave/Rotaclave Area clear of obstructions

  • Is the housekeeping of all other areas of the Plant Area acceptable

Team Leader Checks/Documents

  • TEAM LEADER SHEETS COMPLETED AND UP TO DATE

  • SHREDDER LEV SYSTEM OPERATIONAL

Health & Safety General

Fire Exits

  • Are all fire exits are clear of obstructions

  • Assembly Point Visible

  • Fire Risk Assessment Available

  • Fire Extinguishers unobstructed and in place

  • Visitor and Staff Signing in and out available

  • Accident Book Available

  • Any Accidents to report ( Provide details on occurrence) Inc Near Miss.

  • First Aid Boxes Stocked and available

  • Eye Wash Stations Stocked and Eye Wash Within Date

  • ALL STAFF WEARING APPROPRIATE PPE

  • WELFARE FACILITY CLEAN AND TIDY

  • WASHROOM/TOILET FACILITY CLEAN AND TIDY

  • Is there a Health & Safety Representative

Waste Pallets and Bins on site

  • Total Number of Hazardous Pallets on Site and weight (record in notes section)

  • Total Number of Non Hazardous Pallets and weight on site (record in notes section)

  • Total Number of bins on site and weight (record in notes section)

  • Are all bins stored with lids closed

  • Have bins containing orange treatment wastes been processed within the 48 hour permit limit

  • Waste Tracking Logs Completed

  • Date/Weight/Waste Type Labels placed on Pallets

  • Electronic Pallet Log Completed

  • Are all pallets in storage wrapped sufficiently

  • Are wastes stored on pallets segregated correctly (no mixing of waste types of a pallet)

  • Are all pallets stored stacked in a safe manner

  • Weighbridge Area clear of obstructions

Daily Waste Acceptance Checks

  • Number Of Checks Carried out

  • Number Of Non-conformances raised

Site Visits

  • Any Announced Visits (Confirm who in notes section)

  • Any Unannounced Visits (confirm who in notes section)

PPM CHECKS

  • PPM Checks Carried Out

Main Actions from PPM and Site Inspection (record in notes section)

Efficacy Tests

  • Spore Test Completed Monthly

  • Record date of last spore test sent to laboratory

  • PLC Download Completed (Chart Data saved)

  • Plant Manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.