Title Page
-
Conducted on
-
Prepared by
-
Site Address
Odour Management
-
Confirm Wind Direction and Strength (Low-Med-High) in Notes Section
-
Bin Lids shut on bins used for storage
-
Is the site Odour Management Plan being complied with
Yard Area (including car parking areas and boiler areas (if applicable))
-
Is the housekeeping of all areas of the Yard acceptable
-
Is the housekeeping of the Fence Line acceptable
-
Is all visible drainage on site free from obstruction
-
Is the Building Structure acceptable
-
Are the compactor skips stored in yard suitable for road transport
-
Fuel Tanks and Bunds
Plant Area
-
Is the Fridge Operational
-
Are all anatomical wastes onsite placed in the fridge
-
Spill Control / Spillage Kit Available
-
Is the housekeeping around the compactor unit acceptable
-
Is the housekeeping around the autoclaves/rotoclaves acceptable
-
Autoclave/Rotaclave Area clear of obstructions
-
Is the housekeeping of all other areas of the Plant Area acceptable
Team Leader Checks/Documents
-
TEAM LEADER SHEETS COMPLETED AND UP TO DATE
-
SHREDDER LEV SYSTEM OPERATIONAL
Health & Safety General
Fire Exits
-
Are all fire exits are clear of obstructions
-
Assembly Point Visible
-
Fire Risk Assessment Available
-
Fire Extinguishers unobstructed and in place
-
Visitor and Staff Signing in and out available
-
Accident Book Available
-
Any Accidents to report ( Provide details on occurrence) Inc Near Miss.
-
First Aid Boxes Stocked and available
-
Eye Wash Stations Stocked and Eye Wash Within Date
-
ALL STAFF WEARING APPROPRIATE PPE
-
WELFARE FACILITY CLEAN AND TIDY
-
WASHROOM/TOILET FACILITY CLEAN AND TIDY
-
Is there a Health & Safety Representative
Waste Pallets and Bins on site
-
Total Number of Hazardous Pallets on Site and weight (record in notes section)
-
Total Number of Non Hazardous Pallets and weight on site (record in notes section)
-
Total Number of bins on site and weight (record in notes section)
-
Are all bins stored with lids closed
-
Have bins containing orange treatment wastes been processed within the 48 hour permit limit
-
Waste Tracking Logs Completed
-
Date/Weight/Waste Type Labels placed on Pallets
-
Electronic Pallet Log Completed
-
Are all pallets in storage wrapped sufficiently
-
Are wastes stored on pallets segregated correctly (no mixing of waste types of a pallet)
-
Are all pallets stored stacked in a safe manner
-
Weighbridge Area clear of obstructions
Daily Waste Acceptance Checks
Site Visits
-
Any Announced Visits (Confirm who in notes section)
-
Any Unannounced Visits (confirm who in notes section)
PPM CHECKS
-
PPM Checks Carried Out
Main Actions from PPM and Site Inspection (record in notes section)
Efficacy Tests
-
Spore Test Completed Monthly
-
Record date of last spore test sent to laboratory
-
PLC Download Completed (Chart Data saved)
-
Plant Manager