Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Site Induction / Signing in and out completed
-
Risk Assessments cover working activities
-
Method Statement cover working activities
-
COSHH Assessments Provided
-
Asbestos Survey Provided
-
Emergency Procedures provide and correct
-
Acknowledgment Sheet Signed and Acknowledged
-
CPP Provided for Site
-
Qualified / suitably trained for works
-
Tool Box Talks for specific job
-
Safe Work Procedures Followed
-
Permit to Work Required?
-
Personal Protective Equipment being used?
-
PPE Provided
-
Fire and emergency plan/procedures are operatives aware of rules
-
Fire Extinguisher Available and Serviced (12months)
-
First Aid Kit
-
Spill Kit provided?
-
Working at Height
-
Equipment in use - Ladders/Scaffold/Hop-Ups
-
Equipment free from damages
-
Equipment Suitable for the task
-
Working at height for extended periods
-
Ladder Inspection completed
-
Scaffold inspection and tag system in place and up to date
-
Atlas training completed / in-date
-
Equipment Checks
-
Site Free from 240v Equipment
-
PAT Testing (3 monthly)
-
All equipment free from damages
-
Visual Inspection of all equipment
-
Correct use of portable tools and equipment
-
Welfare
-
Sufficient toilet facilities
-
Hot/warm and cold running water provided
-
Works are not being conducted in areas that may add to the poor conditions
-
Is the site free from litter?
-
House Keeping to standard?
-
Appropriate signage available and in use?
-
Limited numbers present within property?
-
Notes
-
Recommendations/Observations
-
Contracts Manager :