Title Page

  • Job #

  • Job Name

  • Jobsite Location
  • Report Date

  • Weather

  • Temperature

  • Prepared by

Safety Checklist/Schedule

SAFETY

  • Are jobsite safety checklists being completed weekly?

  • First aid kit on jobsite?

  • Safety meetings being held & minutes recorded?

  • Fire extinguishers at each work area & mounted on visible stands?

  • Goggles being worn when required?

  • Excavations over 5' deep properly sloped or shored?

  • Safety rails & barricades in place?

  • Steps & handrails properly constructed at entrances & trailers?

  • Company Minimum Safety Requirements list being followed?

  • Company Personal Protective Equipment requirements being followed?

  • Project safety signage comply with Batten & Shaw standards?

  • Emergency contact list & Action Plan posted? Facility has copy?

  • Is temporary lighting adequate inside the building?

  • Are there any shutdowns occurring in the coming week ?

  • Facility Rep Informed- Date Required

  • Was an Incident Report OSHA Form filled out today?

  • Details

SCHEDULE

  • Project schedule posted in field office & highlighted up to date?

  • Superintendent managing 4-Week Lookahead schedule to Master Schedule?

  • Is the project on schedule? If not, what is the plan to make up time?

  • Plan to Correct:

  • Are key milestones included on Master Schedule & being met?

  • Project Schedule Status:

Site Conditions/Security/Owner/Job Management

SITE CONDITIONS

  • Project generally clean & orderly?

  • Construction signs & fences being maintained?

  • Jobsite appearance meet company standards?

SECURITY

  • Job box locked when not attended?

  • Building capable of being locked at night?

  • Tools, trailers, building, & site left in a secure condition when not attended at night?

  • Badging requirements being adhered to by onsite construction personnel?

OWNER

  • Meeting held with Owner or Owner's Rep?

  • Information Discussed:

JOB MANAGEMENT

  • Daily reports up to date?

  • ICRA Program implemented correctly?

  • Are submittals/shop drawings completed & copies on-site? If not, when do you expect completion?

  • Are RFI's, ASI's, & amendments posted on master drawings in field office?

  • Mock-up panels built correctly & approved before work is installed?

  • Pre Installation meetings being conducted & documented per company policy?

  • Is field paperwork delivery to Batten & Shaw home office accurate & timely?

  • Are As-Built drawings being kept up-to-date thru the project?

  • Site observation deficiencies being corrected in a timely manner?

  • Are A/E observations being addressed timely? (5 days)

  • Is quality of work acceptable?

  • Picture

  • Quality of Workmanship:

  • Are subcontractors field test inspection verifications by Batten & Shaw personnel being documented per the contract specification?

  • Has pre-commissioning meeting been held & responsibility matrix been provided to applicable parties?

  • Is the Interim Life Safety Measures (ILSM) plan in place & up to date?

  • Subcontract management policy pre-construction meetings being held & minutes submitted for each trade?

  • Have all ADA requirements been reviewed & confirmed by both BSI field & office?

  • Testing lab conducting all required tests?

  • Any Subcontractors working after hours or weekends without a Superintendent present?

Manpower

SUBCONTRACTOR MANAGEMENT

  • Sitework

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • Demolition

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • Concrete

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • Masonry

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • Steel

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • Millwork

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • Glass/Glazing

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • Drywall

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • EIFS

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • Painters

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • Acoustical Ceilings

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • Flooring

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • Wet Fire Suppression

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • Plumbing

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • HVAC

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • T&B

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • Electrical

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • Abatement

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • Trade

  • Subcontractor
  • On-Site

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

  • Low Voltage

  • Foremen

  • # of Foreman

  • Men

  • # of Men

  • Progress Made

Site Visit Specific Notes

General Project Information:

Project Progress Information

  • Daily Update Pictures

  • Notes

Daily Report Authentication

  • Batten & Shaw Representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.