Title Page
-
Address
-
Client
-
Conducted on
Site Identification
-
Is address in google maps
-
General photos of site and surroundings. Photos to cover all angles of block including rear to front of block photos. photos to include properties either side of boundaries.
-
Are boundary identification pegs evident<br>
-
Will site required additional site survey prior site start
-
General check for Fireants
-
Were any Fireants found?
-
Do any boundary fences need to be removed prior site start or during construction
-
Will retaining walls be required prior or after earthworks
-
If retaining walls are required prior site start will part install of services eg, stormwater, electrical, communications be required
Site Condition
-
Will site require slashing prior site start
-
Is site clean of all debris
-
Are there any trees that will require removal prior site start
-
Is kerb damaged
-
Are there stormwater kerb adapters installed
-
Type of Kerb
-
Is footpath damaged
-
Is there a possibility construction traffic could damage footpath
Location of services
-
Is underground power available.
-
Is Electrical Pillar damaged
-
Is overhead power available
-
If Yes, will a temporary builders pole be required to provide electricity to the building site
-
Will temporary builders pole "position" impact the installation / connection of any services on site
-
Please take photo nominating prefered position of temporary builders pole
-
Is there a separate communications pit
-
Is Comms pit damaged
-
Is water meter box installed
-
Is water meter box or lid damaged or missing
-
Photo of water meter usage
-
Is natural underground gas available. check if any badges on kerbs
-
Is there a stormwater pit installed
-
Is stormwater pit damaged
-
Can stormwater achieve fall to kerb or stormwater connection point
-
Is sewer manhole installed
-
Is sewer manhole lid or surround damaged
POOL CONSTRUCTION
-
Will pool be installed prior to piering
-
Will any fences need to be removed prior pool installation
-
Will any retaining walls need to be installed prior to pool installation
-
Are there any conductive areas within 1200 of the pool on boundaries, eg, retaininng wall posts, colorbond fencing, post stirrupus on top of retaining walls etc.
-
Will the client require additional earthing of these conductive materials?
-
General comments
Access and storage of building materials
-
If Acreage or similar, is there a Culvert at the entrance to the property that may hinder machinery or delivery trucks entering the property due to the profile of the Culvert
-
Will traffic control be required due to 100mts from a School, Hospital, Bus stop, Main rd, Traffic lights etc
-
Will deliveries stop or disrupt traffic or pedestrians
-
Is there adequate parking for tradespeople
-
Is there No stopping lanes, No parking signage, No standing signs near access gates
-
Is there adequate room for storage of materials
-
Will any future building materials have to be delivered prior site start
-
Will there be additional excess soil removal from site
-
Can the site toilets be located to suit weekly servicing by supplier's pump.
-
Will extra all weather access material be required (standard 6m x 3m allowed)
-
Will extra barrier mesh be required due to fall of land, neighbouring homes at a lower level etc
-
If 2 storey home will the scaffold require mesh or shadecloth to protect neighboring properties
-
Will additional site security perimeter fencing be required
-
Will the use of skip bins be required
-
Additional comments,
-
Photos
-
Stylemaster representative
-
Completed on
-
Select date