Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Previous Actions
-
Have actions from previous inspection been completed
Welfare
-
Toilets
-
Washing facilities
-
Canteen
-
Drying room
-
Are first aid provisions adequate
-
Photo
Documentation
-
Operatives signing in /out on site attendance register
-
Risk Assessment and Method Statement signed
-
Statutory forms displayed
-
Photo
-
Operatives are carrying CSCS Cards appropriate for the task
Occupational Health
-
Are PDL operatives Face Fit Tested
-
Are there adequate controls for skin protection
-
Are there adequate controls against noise and vibration
-
Are there adequate controls for dealing with Manual Handling issues
Work Area
-
Are walkways stairways clearly marked and free from obstruction?
-
Photo
-
Is there safe access and egress to and from the plot / work area ?
-
Add media
-
Area identified
-
Are pedestrians segregated from heavy plant and site traffic ?
-
Photo
-
Is the there adequate lighting ?
-
Is there a secure working area for storage of materials and for waste skips with suitable access for deliveries and removals ?
-
Are there adequate emergency escape routes from all areas of the site ?
-
Is there a suitable fire plan,fire extinguishers and communication?
Working at Height
-
Are Operatives trained competent and supervised for working at Height ?
-
Is all equipment suitable for the task and maintained ?
-
Are all components available and in good condition?
-
Is the floor surface sound and of level construction?
-
Has any safer system of work or access been considered?
Mobile Tower Inspection
-
Are the manufacturers instructions and guidance available for use and have been complied with ?
-
Has a competent person erected the tower
-
Is there a current scaff tag on the tower ?
-
The tower is erected and adjusted so that it is level,the brakes are locked and the outriggers are locked into position.<br>The frame and adjustable legs are on a firm base, at ground level ?
-
All braces are in place and secured as per manufacturer's /suppliers instructions ?
-
The tower hasn't been modified ?
-
The base to height ratio is within the manufacturer's / suppliers instructions ?
-
The trap hatch is installed and operational ?
-
Toe boards and guard rails are fitted ?
-
Contact with plant and machinery is prevented using fencing and warning signs ?
-
The tower is not under or near overhead power lines ?
-
There are no signs of damage to : braces,span frame,castors,brakes,adjustable leg or fixed platform ?<br>
Tools and Equipment
-
Operatives are Instructed Trained and Supervised
-
Equipment is suitable for the task?
-
Are supervisors using PDL inspection procedures?
-
Electrical Equipment is PAT tested
PPE
-
PPE is a last resort and must comply with the main contractors requirements as identified in their site induction.
-
Has adequate training and instruction been given in the use of appropriate PPE ?
-
Has the PPE been inspected and maintained?
-
Is PPE suitable for the task?
-
Is the correct PPE being used?
Corrective actions
Sign Off
-
Contractors Representitive
-
Auditors signiature