Information

  • Pret A Manger Project Manager

  • Principal Contractor

  • Inspection By

  • Inspection Date & Time

  • Location

  • Client and project name

Work activity

  • Give a brief description of the work activity

  • Add media

  • Are actions from previous audit closed out?

Monitoring & Control

  • Is the Construction Phase Plan (CPP) suitable?

  • Have inductions been completed?

  • Is the asbestos survey available?

  • Has the asbestos survey's contents been communicated to the site team?

  • Are all statutory notices and signs on display?

  • Health and Safety Policy

  • Health and safety Law Poster

  • Liability Insurance Certificate

  • Have RAMS been signed by site team?

  • Has toolbox talk training been given regularly?

  • Has pre-task planning being carried out?

  • Has the accident/ incident reporting procedure been followed (if applicable)

Sub-Contractor Management

  • Sub-contractor RAMS review complete

  • Regular inspections and monitoring of sub-contractors

Welfare

  • Toilets

  • Canteen

  • Changing/ drying

Security

  • Prevention of unauthorised access

  • Appropriate segregation of the general public

First Aid

  • Suitably trained First Aiders

  • Emergency arrangements in place

Fire Arrangements

  • Fire risk assessment completed

  • Fire Plan

  • Fire exit signage

  • Fire Points

  • Hot working arrangements

Personal Protection Equipment

  • PPE Compliance

Electrical

  • Temporary electrical supply certificate

  • Isolation certificates

  • Portable appliance testing (PAT)

  • Electrical permit procedure followed

Housekeeping

  • Slip, trips & falls

  • Tidiness

  • Stacking of materials

  • Appropriate management of waste

Lifting Operations

  • Are lifting activities being undertaken?

  • Planning of lifting operations

  • Thorough examination certificates available for all lifting equipment and accessories

  • Regular inspection of lifting equipment and accessories

Work Equipment

  • Plant and equipment inspection certificate

  • Regular inspection of plant and equipment

Manual Handling

  • Avoid, assess, reduce principle adopted

  • Correct techniques observed

Traffic Management

  • Traffic management arrangements adequate

  • Appropriate segregation

  • Suitable signage

Occupational Health

  • Control of noise

  • Control of vibration

  • Control of dust

Scaffolding

  • Is scaffolding being used?

  • Hand over certificate

  • 7 day inspection

  • Access and egress maintained

Gas/ LPG

  • Is gas or LPG being used on site?

  • Storage arrangements suitable

  • Equipment in order

Stepladders/ Ladders

  • Safe use observed

  • Suitable condition

  • Regular inspection

Mobile towers and podiums

  • Operatives erecting are competent

  • Equipment erected correctly

  • Safe use observed

  • Regular inspection

Working at height (Other)

  • Is another means of working at height being undertaken?

  • Suitable planning and adoption of the hierarchy of control

  • Competence

  • Suitable access/ egress

  • Adequate edge protection

  • Regular inspection by competent person

Excavations

  • Are excavation works being undertaken

  • Services identification

  • Permit to dig

  • Preventing collapse

  • Access and egress

  • Edge protections

  • Signage

  • Regular inspection by a competent person

COSHH

  • Assessment completed

  • Compliance with control measures

Supervisor signiture

  • Add signature

Auditor signiture

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.