Information
-
Pret A Manger Project Manager
-
Principal Contractor
-
Inspection By
-
Inspection Date & Time
-
Location
-
Client and project name
Work activity
-
Give a brief description of the work activity
-
Add media
-
Are actions from previous audit closed out?
Monitoring & Control
-
Is the Construction Phase Plan (CPP) suitable?
-
Have inductions been completed?
-
Is the asbestos survey available?
-
Has the asbestos survey's contents been communicated to the site team?
-
Are all statutory notices and signs on display?
-
Health and Safety Policy
-
Health and safety Law Poster
-
Liability Insurance Certificate
-
Have RAMS been signed by site team?
-
Has toolbox talk training been given regularly?
-
Has pre-task planning being carried out?
-
Has the accident/ incident reporting procedure been followed (if applicable)
Sub-Contractor Management
-
Sub-contractor RAMS review complete
-
Regular inspections and monitoring of sub-contractors
Welfare
-
Toilets
-
Canteen
-
Changing/ drying
Security
-
Prevention of unauthorised access
-
Appropriate segregation of the general public
First Aid
-
Suitably trained First Aiders
-
Emergency arrangements in place
Fire Arrangements
-
Fire risk assessment completed
-
Fire Plan
-
Fire exit signage
-
Fire Points
-
Hot working arrangements
Personal Protection Equipment
-
PPE Compliance
Electrical
-
Temporary electrical supply certificate
-
Isolation certificates
-
Portable appliance testing (PAT)
-
Electrical permit procedure followed
Housekeeping
-
Slip, trips & falls
-
Tidiness
-
Stacking of materials
-
Appropriate management of waste
Lifting Operations
-
Are lifting activities being undertaken?
-
Planning of lifting operations
-
Thorough examination certificates available for all lifting equipment and accessories
-
Regular inspection of lifting equipment and accessories
Work Equipment
-
Plant and equipment inspection certificate
-
Regular inspection of plant and equipment
Manual Handling
-
Avoid, assess, reduce principle adopted
-
Correct techniques observed
Traffic Management
-
Traffic management arrangements adequate
-
Appropriate segregation
-
Suitable signage
Occupational Health
-
Control of noise
-
Control of vibration
-
Control of dust
Scaffolding
-
Is scaffolding being used?
-
Hand over certificate
-
7 day inspection
-
Access and egress maintained
Gas/ LPG
-
Is gas or LPG being used on site?
-
Storage arrangements suitable
-
Equipment in order
Stepladders/ Ladders
-
Safe use observed
-
Suitable condition
-
Regular inspection
Mobile towers and podiums
-
Operatives erecting are competent
-
Equipment erected correctly
-
Safe use observed
-
Regular inspection
Working at height (Other)
-
Is another means of working at height being undertaken?
-
Suitable planning and adoption of the hierarchy of control
-
Competence
-
Suitable access/ egress
-
Adequate edge protection
-
Regular inspection by competent person
Excavations
-
Are excavation works being undertaken
-
Services identification
-
Permit to dig
-
Preventing collapse
-
Access and egress
-
Edge protections
-
Signage
-
Regular inspection by a competent person
COSHH
-
Assessment completed
-
Compliance with control measures
Supervisor signiture
-
Add signature
Auditor signiture
-
Add signature