Title Page
-
Project Name:
-
Project Manager:
-
Foreman / Onsite Representative:
-
Subcontractors:
-
Construction Manager / Owner:
-
Number of employees on site?
-
Prepared by:
-
Date:
-
Division:
- Cleveland
- Toledo
- Technologies
- Akron
- Mansfield
- Dayton
- Firelands
Jobsite Documents
-
Corporate Safety Program Manual
-
SDS Book
-
Site Emergency Action Plan
-
Pre-Task Plan
-
Toolbox Talks
-
First Aid Kit / Eyewash
General Conditions
-
Jobsite orderly
-
Slip / trip hazards controlled
-
Exits marked and unobstructed
-
Traffic hazards controlled
-
Adequate lighting
-
Rebar capped
-
Rigging & tools in good condition
Competent Person
-
First Aid / CPR
-
Aerial Lift / Scissors Lifts
-
Scaffolds
-
Energized Work
-
Confined Space
-
Mobile Equipment
-
Crane / Rigging
-
Powder Actuated Tools
PPE
-
Hard hats correct
-
Proper eye protection
-
Proper gloves for the task
-
Proper foot protection
-
Proper clothing - FR or high visibility
-
Arc flash PPE
-
Face protection as required
-
Hearing protection as required
Electrical
-
Lockout procedure followed
-
All outlets / tools GFCI
-
Panels covered, locked and labeled
-
Openings in cabinets or boxes covered
-
Conductors secured properly
-
Temp splices covered
-
Temp lights elevated & lamps caged
-
Energized Work Plan / Permit used
Fall Protection
-
Protection from openings / edges / holes
-
Guardrail systems correct
-
Fall arrest systems used properly
-
Retractable below 17 feet
-
Protection from falling objects
-
Tie-off in aerial lifts
-
Lifts inspected & operator trained
-
Scaffold inspected and used properly
Fire Protection
-
Fire extinguisher inspected & available
-
Fire control systems unobstructed
-
Hot Work Permit where required
Ladders
-
Ladders in good condition
-
Properly set up
-
Properly used
Confined Space
-
Employees trained
-
Permit followed
Excavations
-
Utilities located (OUPS)
-
Inspected by a competent person
-
Notes / Comments?
-
Person conducting the audit: