Title Page
-
Site
-
Client Name
-
Names of Operatives on Site
-
Auditors Name
-
Date that the Scaffold Audit was performed
Site Scaffolding Audit
Site Documentation
-
Is there means of signing in / out to site and are all our operatives currently signed in?
-
Is there an up to date and relevant risk assessment, method statement and recue plan available for the site in question? (RAMS)
-
Have all operatives been briefed on the site specific RAMS and acknowledged the risk assessment and method statement by means of a signature?
-
Have any unplanned works been confirmed and verbally instructed (CVI) by the client and Craven Scaffolding Ltd and been signed for?
-
Are all Scaffolding handovers completed and are all records available on site?
-
Is there records of up to date and relevant dismantle plans that have been completed?
-
Is there an up to date scaffold register in place and are scaffold tags clearly visible, signed and dated?
-
Are employees trained and competent for the task in hand? Are training records available?
Designs for Tube & Fitting / System Scaffold - Manufacturers Instructions
-
If system scaffolding is being used are the manufacturers instructions available on site and are they relevant to the type of system being used?
-
If system scaffolding is being used has it been erected in accordance with the manufacturers instructions?
-
Are all Tube & Fitting scaffolds erected in accordance with the supplied TG20:21 compliance Sheets?
-
Are all designed scaffolds erected in accordance with the approved design drawings?
-
Have all Construction issue working designs and TG20:21 compliance sheets been issued to the client for all scaffolds that have been erected on site and are they available?
Construction and Workmanship of all Site Scaffolds
-
Are foundations adequate and suitable for all scaffolds observed?
-
Are all standards adequately installed? (consider level, joints, connections and spacings etc).
-
Are ledgers adequately installed? (consider level, joints, connections and spacings etc).
-
Are transoms adequately installed? (consider spacing, extension and connections etc).
-
Are all couplers used correctly and used appropriately?
-
Has all bracing been installed correctly and in-line with the approved working design / TG20:21 compliance sheet & manufacturers instructions provided?
-
Are all working platforms correctly boarded, boards of good quality and platforms of adequate size for the activities being undertaken?
-
Are all guardrails adequately installed to all working platforms and set at the correct height of 950mm?
-
Are all toe boards adequately installed to all working platforms, correctly supported and in good overall condition?
-
Is the access and egress to the scaffold safe, appropriate and without undue risk to the scaffold users?
-
If ladders have been installed are they in good overall condition?
-
For all ladders that have been installed, have they been attached to the structure using Lashing or ladder clamps?
-
Are all loading bays erected in accordance with the approved working design / TG20:21 compliance sheets or manufacturers instructions?
-
Is the scaffold suitably tied or stabilised in-line with TG4:19, design / TG20:21 compliance sheet or manufacturers instructions?
-
Has Preliminary testing been undertaken in accordance with TG4:19 and certificates been completed?
-
Has proof testing been undertaken in accordance with TG4:19 and have certificates been completed?
-
Have brick guards been installed to all working platforms & installed correctly?
-
Has debris netting / sheeting been installed and is this in-line with the design / TG20:21 compliance sheet and manufacturers instructions?
-
Have Craven Scaffolding signs or banners been installed onto the scaffold to promote the company
-
Is housekeeping being implemented on site and are all levels of the scaffold free from obstructions?
Scaffolding Team Observations
-
Were any scaffolders / operatives observed working at height at the time of site visit?
-
Have all scaffolders / operatives been observed to be working safely?
-
Were scaffolders observed using their scaffold steps?
-
Were all site scaffolders / operatives wearing the correct PPE / RPE in accordance with our company's risk assessment and also in accordance with the site minimum site standards?
-
Were all scaffolders / operatives observed to be using their chinstraps whilst wearing the 4-point hard hats that have been issued to all Craven employees?
-
Were Scaffolders observed to be using ear plugs whilst operating impact wrenches as highlighted within their RAMS?
Site Welfare - Workplace (Health, Safety & Welfare) Regulations 1992
-
Is there sufficient toilets & washing facilities for the amount of operatives on-site?
-
Do all site facilities have the use of hot, cold or warm running water?
-
Do all site facilities have adequate lighting & ventilation?
-
Is the site eating facilities adequate in size and fit for its intended purpose?
-
Are all welfare facilities in a clean and sanitary condition and safe for all site personnel to use?
-
Is drinking water readily available to all operatives on site through a direct mains supply or by any other means?
-
Is there sufficient drying facilities on site and are they of adequate size & fit for its intended purpose for all site personnel that are operational on site?
-
Additional comments or recommendations?
Auditor Information
-
Time that the audit was completed
-
Name & Signature of the person conducting the site audit