Information
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Select date
-
Client/Customer
-
Contact Name: Phone Numbers: Email Address:
-
Site Address
Scaffold Requirements
-
Description of scaffold required:
-
Hire Period if Known:
-
Sketch of Area Scaffold Required
-
Picture of area or elevations
-
Base/Ground Conditions:
-
Is a paving license required?
-
Physical Ties to building or Rakers required?
-
Does this scaffold require a design?
-
Is the scaffold to be sheeted? If so please state whether monarflex or debris netting.
-
Vehicular access good or bad?
-
Carry Materials?
-
Are there any special,requirements? Ie. Confined space or rescue personnel in attendance. if so, please state requirement.
Risk Assesment for carrying out works.
-
Slips/Trips/Falls
-
Falling/Flying Objects or Debris
-
Manual Handling
-
Heat/Fire
-
Moving Vehicles/Site Plant
-
General Public
-
Dust/Fumes/Noise
-
Overhead Powerlines (Sheathed or Unsheathed)
-
Poor Lighting
-
Other (please Identify)
Control Measures for Hazards Identified:
-
Risk Control and Method:
-
Signee: