Information

  • Audit Title (Job Number - YYYYMMDD)

  • Project Name

  • Conducted on

  • Prepared by

Field Compliance

  • PPE inspection; compliance, proper storage, task specific.<br>

  • Select from range

  • Housekeeping Inspection; Work areas neat and orderly, passageways clear of debris, tripping hazards, etc..

  • Select from range

  • Ladder / Scaffold Inspections; tagged and dated by competent person each day in use.

  • Select from range

  • Power / Hand Tool Inspections; Proper guards, handles and use.

  • Select from range

  • Vehicle and Equipment Inspections; within site speed limit, back-up alarm, all equipment functioning, no cell phone use, etc.

  • Select from range

  • Eye Wash stations within the work area; 15 minute eye wash within reasonable distance to work area

  • Select from range

  • Rebar and impalement exposures protected properly? Both on vertical and horizontal bars that may cause injury.

  • Select from range

  • HazCom Inspections; stored on proper containment skids and within capacities / Spill kits placed where needed / Proper labeling

  • Select from range

  • Fire Safety Inspections; At required locations - connexion boxes, fuel storage, cranes, vehicles, welding machines, compressors, etc.

  • Select from range

  • Electrical Safety Inspections; color-coded for quarter, good condition and electrical panels display voltage label on front of panel.

  • Select from range

  • Rigging Inspections; Proper storage, operating condition, proper use.

  • Select from range

  • Excavation Inspection; barricaded, ladders, cave in protection, spoil back, etc.

  • Select from range

  • Demolition Inspection; Dust suppression, barricaded as needed, general work practices.

  • Select from range

  • Hot works / Welding inspections; Barricaded / Welding screens / Fire watch with extinguisher / Fire protection

  • Select from range

  • Confined Space inspections; proper setup including barricades / Fans / Monitors / Permits

  • Select from range

  • Lockout / Tag-out Inspections; Proper procedure in place and used where needed

  • Select from range

  • MPT Inspections; In place where applicable / Personnel trained properly.

  • Select from range

  • Fall Protection Inspections; guardrails in place able to withstand 200 pounds side force / Hole covers and overhead work addressed properly.

  • Select from range

  • Fall Arrest Inspections; Are all harnesses being worn correctly with proper anchorage and lanyard being used correctly. Proper storage of equipment as required.

  • Select from range

  • Field Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.