Information
-
Tech Name
-
Audit Month
-
System: Lubbock
-
Conducted on
-
Prepared by
-
Location of QC
-
Work Order Type/Account #
Pole Attachement
-
30" pole framing clearance (Drop attachment on correct side of pole) -10
-
Proper pole attachment used (span clamp on strand or J-hook in pole; no P-hooks in pole) -10
-
Span clamp attachment is not on the lashing wire -10
-
Drop hangers used at span clamp and P-hook -10
-
Less than 2 traps connected to any tap port (additional traps secured to strand w/ cable-ties) -10
-
Has cable been secured, cable-tied under the stand or coax (not on the expansion loop) -10
-
Have all connectors been properly weather protected (sealing sleeves) -20
-
Have all connectors been properly compressed and tightened -30
-
Are all unused tap ports sealed and terminated -10
-
All other connections on pole dressed and proper connections installed and sealed -10
-
If underground, is the drop routed underground into the pedestal -20
-
If underground, is the pedestal secured with a lock or tab-lock -10
-
If drop is laying on ground, was the drop bury turned into the office -20
-
Split back riser installed at the pole as needed (UG Only) -10
-
Is the drop tagged with address tag and service tag (if service tags are used) -20
-
Was the correct service trap installed? -50
-
All clearances are correct (Note specific discrepancies ex. Pole, Street, Driveway Clearance) -30
HOUSE (Exterior)
-
Proper drop attachment to the structure (>12" from power, secured, etc.) -10
-
6" drip loop at attachment -10
-
Bonding practices prioritized and follow specification -30
-
Was a ground tag installed? -10
-
Ground block secured horizontally (service calls only) -10
-
Splitters secured with house box (SDU box) -10
-
Have all outdoor connectors been properly weather protected (sealing sleeves & approved connectors) -30
-
Have all connectors been properly compressed -30
-
Have all connectors been properly tightened -30
-
Have all bends in cable followed proper bend radius specs (10 x diameter of coax used) -10
-
All existing outlets properly fastened to house and entry's sealed -10
-
Was the cable routed in an aesthetically pleasing manner -10
-
Cable clips installed appropriately & neatly spaced 14"-18" apart -10
-
Was an entry bushing and RTV sealant used at all cable/phone line house entry -10
-
Drip loop at structure entry w/ appropriate bend radius for cable used -10
-
Has conduit been placed at 18"-24" up the wall into the house box (UG Only) -10
-
Is phone line properly secured to house (if applicable) -10
-
House box or NID mounted securely to the house next to power meter (all new installs) -10
Interior Wiring
-
Was wall plate used at cable entry -10
-
Was proper phone line connections used to feed the house network -10
-
Were all telephone lines tested -10
-
Were all channels received, verified w/channel line-up -10
-
Was customer education preformed (ie all functions, services and features) -10
-
Was signal leak detected at address -10
-
Were transmit/Receive levels verified and logged for modem -10
-
Was a dedicated outlet run for modem installations -10
-
Does telephone line test check ok -10
-
Was general rubbish generated from work removed from customer premise -10
Report Card Score: 100 = 5; 99-90 = 4; 89-80 = 3; 79-70 = 2; 69 or less =1
-
Total Score (100 points possible; 70 or less points Fail):
-
Additional Comments
-
Tech Signature
-
Supervisor Signature
-
Manager Signature