Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Is the 6500,2150, and FDP been labeled?
-
Take picture of all gear labels
-
Has gear been racked with hex screws and mounted at a proper working level according to the SOW?
-
Take picture of all gear in the cabinet or shelter with a full view front and back
-
Has all fiber been ran with boots and labeled with Brady style labels?
-
Take picture of labels - minimum of 5
-
Has the gear been grounded?
-
Take picture of gear with ground and ground readings
-
Has the 6500 power been ran, tagged and laced to standoffs?
-
Take picture of power leads going to the fuse panel or rectifier and power labeling.