Title Page
-
Site conducted
-
Conducted on
-
Prepared by
Untitled Page
-
Project Title:
-
Location:
-
Date of Inspection:
-
Name of Supervisor:
-
Weather:
-
Work in Progress:
Site Safety:
-
Have all workers had 12 hours rest since previous shift
-
Are all workers aware of the WorkSafe procedure
-
Has COSS Briefing been correctly completed, briefed out and signed by all
-
Do WPP / TBF’s (inc. Risk Assessments) cover the work being undertaken
-
Are staff aware of the hazards
-
Is the Team working as per the SSOW planned
-
Protection – are the resources available sufficient to carry out the work safely
-
Authorised Access Point used and suitable
-
If lone working, are the associated hazards addressed within the above
-
If manholes are to be lifted, confined spaces trained if entering
-
If working at night, is lighting available and adequate
-
PPE correct, clean and fit for purpose (including armbands)
-
Spare PPE and other necessary consumables (spray paint, batteries)
-
First Aid Kit – on site and fit for purpose, replenished, in date
-
Welfare – toilets, hand washing / wiping facilities, sufficient drinking water
-
Is the site tidy / good housekeeping
-
Public protected from working site / area
-
Is site access authorised, safe and clear to park
Buried Services Work:
-
Service drawings for the area of works available on site
-
Permit to Dig available and correctly completed and signed
-
CAT / GPR Scan record completed
-
Is CAT Scan user trained? Cert No: Expiry Date:
spare
spare
-
Competency:
-
Do all rail workers have the relevant Sentinel competencies (COSS / IWA / PTS)
-
Has COSS scanned all Sentinel cards
-
Verified (by scanning) that competencies are correct and in date
-
Have any accessed site using Track Visitor Permit
-
First Aid training – name the First Aider on site: Expiry:
Plant, Tools and Equipment:
-
Correct plant, tools and equipment being used
-
Operative trained in use of plant, tools and equipment being used
-
Plant, tools and equipment in good condition and free from visible defects
-
Weekly records maintained of visual inspections
-
Is all equipment calibrated / tested (CAT, survey equipment etc.) Type of Equipment: Calibration / Test Expiry: Type of Equipment: Calibration / Test Expiry: Type of Equipment: Calibration / Test Expiry:
Vehicle – Enter Vehicle Registration:
-
Mileage:
-
Vehicle displaying SLS Corporate Livery (logo’s etc.)
-
Vehicle maintained in a clean and tidy condition
-
Is there any damage to the vehicle
-
Vehicle parked safely without causing obstruction
-
Parking arrangements adequate
-
Is there a First Aid Kit (fully replenished and in date)
-
Is there a Fire Extinguisher (in date)
Environmental:
-
Is there an Environment Management Plan available
-
Is there a Spill Kit available (fully replenished) (Trial Hole Teams)
-
Any waste generated correctly managed and removed from site (spray cans, batteries)
Quality Assurance:
-
Is there a Quality Management Plan available
-
Is there an Inspection and Test Plan available
-
Latest edition of all documentation held
STOP WORK?
-
If there are any non-compliances above, please give details below
-
Action Levels:
-
H – requires immediate action: M – to be resolved in 24 hrs.: L – to be resolved in 7 days:
-
O – date to be resolved by (if longer than 7 days)
-
Item No. from above
-
Summary of findings (ticked NO’s), general comments and observations:
-
Action
-
Level
-
Action to be carried out by who
-
Closed out on day?
-
If NO,
-
close out
-
due by date
Please provide details below of the attitude and behaviours displayed of those on site:
Any Issues / Problems on Site:
Feedback from Workforce on Site:
Details of any Items Issued:
-
HSQE Manager Comments:
-
Include Any Photo’s here: