Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Pre Installation
-
Have walls been cleaned and cleared of debris?
-
Have walls been properly primed?
Installation - Vertical Surfaces
-
Sheets installed in 8' lifts to minimize joints
-
Membrane side overlaps are 2 1/2" minimum
-
Membrane end laps are 5" minimum
-
Top of membrane is sealed with a termination bar and CCW-704 Mastic
-
Penetrations are wrapped, flashed, sealed with mastic, and clamping ring
-
Membrane has been rolled with linoleum roller
-
Wall is free of fish mouths and severe wrinkles
-
If fish mouths are present, they have been corrected by slitting, overlapping flaps, and sealing with a minimum of 6" patch