Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Overview job pictures
-
General audit comments
Explanation of audit scoring
-
"Yes" ( green color) 2 points
( the job site performance met or exceeded expectations for this specific audit question)
" improve"( yellow color) 1 point
( the performance generally met expectations, but some specific improvements are needed.)
" no" (red color) 0 points
( The performance failed to meet expectations, or serious violations.)
"N/A" ( blue color)
(If a question does not apply to the job site activities, the auditor will select N/A for "not applicable ", and no score will be added or
Subtracted from the audit.
P.P.E
-
Are employees wearing hard hats 100% of the time?
-
Are safety glasses worn 100% of the time?
-
Are employees wearing appropriate safety glasses for their environment? ( no sunglasses in dark areas ,no fogging,no defects)?
-
Have face shields been selected for appropriate hazards? ( grinding,drilling overhead)
-
Is Hearing protection being used while sawing inside or on a table saw?
-
Is Eyewash in a accessible area and properly set up?
-
Respirators- if used, are they being used properly?
-
Are gloves and safety glasses being worn during wash down?
-
If required by job site are all employees wearing high visibility clothing?
-
Are employees wearing work boots that comply with SMI?
-
Are employees wearing shirts with four inch sleeves? (No cut offs)
HazCom
-
HazCom notebook present?
-
HazCom checklist present ?
-
Containers labeled properly?
Administration
-
Are labor laws posting available in an accessible place?
-
Are the safety data sheets( SDS documents) on site for every potential chemical exposure?
-
Has a site safety plan been developed and followed?
-
Are morning huddles being conducted?
-
Have all employees participated in morning stretches?
-
Is Emergency Medical Card posted?
-
Is an approved first Aid Kit present ?
Fall protection
-
Is the fall arrest equipment in good working order( fully functional,no defects,or damage)?
-
Are harnesses worn correctly, with appropriate connection devices (lanyards,SRL) attached to adequate anchorage points ( able to withstand 5,000 lbs force or an engineered safety factor of two times the potential force of the fall)?
-
Have all affected employees been trained on the proper use of personal fall protection systems?
-
Are all employees ( with in 15' of leading edge) protected by personal fall arrest system or guard rail systems?
-
If SMI employees are working from the leading edge have they put up a control access zone 15' feet from the edge? <br>To keep unauthorized people out?<br>
Scaffolds
-
Are scaffolds built level and plumb?
-
Are mud sills (pads) in place, level, and are put on stable ground?
-
Are screw jacks in place,center on pad, and are not jacked up to high?
-
Have all braces been put in place?
-
Are scaffolds fully planked ( where employees are working)?
-
Do plank extend 6" but not more than 12" over frames?
-
Are all guard rails, and end rails in place (6' tall or higher) if employees are working from or accessing the jump?
-
Have all toe boards been installed on all decks with material on them?
-
When foot plank is being used are their foot plank end rails in place (over 6 feet)?
-
Have bricklayer access been put in place when needed?
-
Are scaffolds erected no higher than four times the minimum base width?
-
Are scaffolds tied to structure (30' feet horizontally, 20 feet vertically to first tie and from that point 26' to second tie)?
-
Are the levels the employees are working on free of debris, and can be Easley walk-through?
-
Have employees made safe access to the jumps they are working on( ladders,Hewitt Systems,ect.)
-
Have scaffold tags been filled out( signed and dated) ?
-
Scaffolds are not fully stocked over two an a half jumps ahead.
-
Does the scaffold have pig tails in?
Rigging
-
Are rigging shackles,hooks,and lifting accessories operating freely and in good Oder?
-
Are wire rope slings free of kinks,signs if bird caging,excessive wear,or defect ?
-
In one lay, are there less than three broken wires in one strand ?
-
Within one foot from the eye on a wire rope are there less than 2 broken wires in 1 strand ?
-
Are tags present on all slings that list manufacturer and recommended safe working load?
-
Are synthetic straps in safe condition ( no tears,no visible red stripe,no UV damage)?
-
Are rigging hardware and slings used correctly and within capacity?
Fire protection
-
Are all flammable safety cans properly labeled?
-
Are all fire extinguishers posted near all flammable storage areas and hot work zones?
-
Do all fire extinguishers have a tag demonstrating they have received documented annual inspection?
-
Are all fire extinguishers in good working order (pin and tamper seal present ,good pressure,and hose free ofunobstructed?
Power machinery
-
Are all documented inspections completed before each use?
-
Are all pieces of powered equipment operating well without leaks or obvious signs of physical defects?
-
Are all attachments secured from movement?
-
Are all equipment operators trained and certified on the equipment they are running( forklifts,skid loader, Cranes,ect.)?
Electrical equipment (power tools)
-
Have assured grounding tests been conducted on tools and extension cord in use ( correct color)?
-
Are all extension cords in good condition?
-
Are all manufacturer recommended guards properly mounted and used?
-
Are extension cords plugged in to GFCI protected outlets?
-
Are cords not strung in walk ways or being run over by equipment?
-
Are electric table saws grounded by steel rod?
-
Have lockout tag out been used for defective tools or extension cords?
Excavations
-
If the excavation is deeper than 4' ,is it sloped or benched?
-
Is the spoil pile at least 2' from the edge of the excavation?<br>
-
Is there a ladder or ramp for access every 25' of trench?
-
Has equipment been barricaded from excavation?
Winter enclosures
-
Does the plastic appear to be installed correctly (no loose plastic the wind can get ahold of)?
-
Has the scaffold been secured to the structure or tied down with cables at 15' horizontally and 13' vertically ?
-
Are approved heaters being used?
-
Are heaters being properly ventilated in the shelter?
-
Are there fire extinguishers located close to the heaters?
-
Has lP been properly stored and protected(tied up)?
House keeping
-
Is equipment being cleaned ( mixers, tubs,shovels,ect.)?
-
Are materials being stored properly ?
-
Has used material and debris been cleaned up?