WORKS CHECKLIST

PHASE 1 - Disconnection Checklist

  • Segment Type?

  • Origin Pole Number

  • Service Pole Number

  • STN Required?

  • STN Number

  • Type of Works?

  • Road Type?

  • Add Pre-Work Photos

  • Pre-work Property Height?

  • How many phases?

  • Phase Rotation?

Switch Positions

  • Main Switch

  • Hot Water Main Switch

  • Solar Disconnected?

PHASE 2 - Reconnection Checklist

  • Add Post-Work Photos

  • Post-work Property Height?

Load Test Results

  • A Phase Voltage

  • Active Current

  • Neutral Current

  • Main Earth Current

Switch Positions

  • Main Switch

  • Hot Water Main Switch

  • Solar Disconnected?

  • Phase Rotation upon completion? (Ensure same as disconnection)

  • Tested By

  • Witnessed By

PHASE 3 - Stock Checklist

  • Cable Type

  • Cable Length

  • Network Mains Type

  • Open End Clamp

  • Closed End Clamp

  • D-Shackle

  • J-hook

  • HSCs

  • AL Mains Connectors

  • CU Mains Connectors

  • Insulated Piercing Connectors

  • Fuse Cartridge

  • Any Additional Works?

  • Additional Switchboard Tests?

  • Bypass Service Fuse Installed?

  • Neutral Bond Replaced (at POS) ?

  • Mains Box Replaced?

  • Main Earth Installed?

  • Main Switch Replaced?

  • Minor Vegetation Removed?

  • Redundant Hardware Removed? (e.g. Flowline, Wiley Bracket)

  • Service Fuse Replaced?

  • Any General Comments (defects, other stock used, Totalsafe details)....

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.