WORKS CHECKLIST

PHASE 1 - Disconnection Checklist
Segment Type?

Origin Pole Number

Service Pole Number

STN Required?

STN Number

Type of Works?
Road Type?
Add Pre-Work Photos

Pre-work Property Height?

How many phases?

Phase Rotation?

Switch Positions

Main Switch

Hot Water Main Switch

Solar Disconnected?

PHASE 2 - Reconnection Checklist
Add Post-Work Photos

Post-work Property Height?

Load Test Results

A Phase Voltage

Active Current

Neutral Current

Main Earth Current

Switch Positions

Main Switch

Hot Water Main Switch

Solar Disconnected?

Phase Rotation upon completion? (Ensure same as disconnection)

Tested By
Witnessed By
PHASE 3 - Stock Checklist

Cable Type

Cable Length

Network Mains Type

Open End Clamp

Closed End Clamp

D-Shackle
J-hook
HSCs
AL Mains Connectors
CU Mains Connectors
Insulated Piercing Connectors
Fuse Cartridge

Any Additional Works?

Additional Switchboard Tests?
Bypass Service Fuse Installed?

Neutral Bond Replaced (at POS) ?

Mains Box Replaced?

Main Earth Installed?

Main Switch Replaced?

Minor Vegetation Removed?

Redundant Hardware Removed? (e.g. Flowline, Wiley Bracket)

Service Fuse Replaced?

Any General Comments (defects, other stock used, Totalsafe details)....

Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.