Title Page

  • 1. Name of Process

  • 2. Part Sr. no

  • 3. Date of Inspection

Untitled Page

  • 4. Is part sr. no punched on part

  • 5. Dimn 133.41 ~ 134.9441

  • 6. Dim 1601.70 ± 1.5

  • 7. total Cd 1035.52 (-0.75 +3.18)

  • 8. Dim 826.77 ±1.5

  • 9. Dim 254 ±1.5

  • 10. Dim 228.60 ±1.5

  • 11. Dim 380.20 ±1.5

  • 12. Dim 775.96 ±1.5

  • 13. Dim 736.60 ±1.5

  • 14. Dim 402.48 ~ 403.98

  • 15. Ensure the front axle plate hole pos

  • 16. Ensure that all BOP parts & child parts are in place as per drawing

  • 17. Ensure that there is no visual defects in tube.

  • 18. Ensure that part welding is as per drawing.

  • 19. Ensure that no weld zone area should not be welded.

  • 20. Ensure that part stamping number is as per drawing.

  • 21. Ensure that part is free from welding defects.

  • 22. Current 220 ~ 260 Amp

  • 23. Voltage 22 ~ 26

  • 24. Gas Flow 15 ~ 20

  • 25. Lug pin qualification ( pin dia 50.80 ) ***

  • 26. Plate pin qualification ( 50.80 ) ***

  • 27. Inspected By

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.