JSA
-
Address
Solar Compliance Checklist
Grid Connect Solar - Site Checklist
-
NMI
-
Meter Number
-
Address
-
Date of this inspection
-
LEI Name
Inverter Details
-
Make
- Aeroshsharp
- Solar River
- SMA (Sunnyboy)
- Sun Twins
- Platinum
- Fronius
- Growatt
- Eversolar
- Other
-
Inverter Make
-
Model
-
Serial Number
-
Output (KW's)
- 1
- 1.5
- 2
- 2.5
- 3
- 3.5
- 4
- 4.5
- 5
- 5.5
- 6
- 6.5
- 7
- 7.5
- 8
- 8.5
- 9
- 9.5
- 10
- other
-
Other output
-
Inverter state upon arrival
-
Inverter anti-island test
-
Inverter state upon departure
-
Reason for off:
Locations
-
Inverter location
- LHS of House
- RHS of House
- Front Door
- Rear of House
- Garage
- Shed
- Inside House
- other
-
Other location
-
Accessible
-
Meter Panel Location
- Front Door
- LHS of House
- RHS of House
- Front Fence
- Shed
- other
-
Other location
-
Accessible
-
Switchboard Location
- Front Door
- LHS of House
- RHS of House
- Front Fence
- Shed
- Inside House
- Garage
- other
-
Other location
-
Accessible
-
Solar AC Isolator
-
Approved Lockout Device Onsite:
-
Smart Meter Installed:
-
Will smart meter fit existing position
-
DC Isolators - ISO MAX
-
ISO MAX documentation left onsite
-
PAL Letter
-
PAL Compliance Check Completed:
-
Customer System at completion:
-
Meter check label attached:
-
Any other issues or notes regarding installation:
-
Attach photo if required
-
Comments regarding photos if required