Title Page

  • Site conducted

  • Is dc cable entry in over flap of felt

  • Is App installed on customers phone

  • Is smoke detector installed

  • Is bird mesh installed

  • Conducted on

  • Prepared by

  • Location
  • PV Modules secure and level/aesthetically pleasing?

  • PV Modules 300mm from Verge, Ridge and Edge of Roof?

  • DC Cables secured and not loose hanging on roof?

  • DC Cable run clipped securely and appropriately labelled

  • Inverter Location. Inverter Level and Secure

  • AC Isolator including labels

  • DC Isolator Including labels

  • Generation meter

  • AC Cable run - if applicable

  • Consumer unit - MCB labelled

  • Henley block connections - if applicable

  • Total Generation to date

  • Schematic diagram secured on site

  • Installation is compliant with MCS MIS 3002

  • Evidence fan installation in bathroom

  • Evidence fan installation in Kitchen

  • Evidence fan installation in WC if applicable

Untitled Page

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.