Title Page
-
Site conducted
-
Is dc cable entry in over flap of felt
-
Is App installed on customers phone
-
Is smoke detector installed
-
Is bird mesh installed
-
Conducted on
-
Prepared by
-
Location
-
PV Modules secure and level/aesthetically pleasing?
-
PV Modules 300mm from Verge, Ridge and Edge of Roof?
-
DC Cables secured and not loose hanging on roof?
-
DC Cable run clipped securely and appropriately labelled
-
Inverter Location. Inverter Level and Secure
-
AC Isolator including labels
-
DC Isolator Including labels
-
Generation meter
-
AC Cable run - if applicable
-
Consumer unit - MCB labelled
-
Henley block connections - if applicable
-
Total Generation to date
-
Schematic diagram secured on site
-
Installation is compliant with MCS MIS 3002
-
Evidence fan installation in bathroom
-
Evidence fan installation in Kitchen
-
Evidence fan installation in WC if applicable