Title Page
-
Document number
-
Name of client/site
-
Conducted on
-
Prepared by
-
Location
Survey Proper
Site Information
-
Site/building name
-
Type of site surveyed
-
Please specify.
-
Photo of site surveyed
-
Name of site agent/manager
-
Contact information of site agent/manager
-
Energy Performance Certificate (EPC) rating
- A
- B
- C
- D
- E
- F
- G
- Unrated
- Unknown
-
Number of Meter Point Administration Numbers (MPANs) on site
-
Specify the MPAN number(s) and their location(s).
Roof Information
-
Roof type
-
Roof construction
- Plain tile
- Wave tile
- Pan tile
- Slate
- Trapezoid
- Rosemary tile
- Standing seam
- Asphalt
- Membrane
- Other
- Unknown
- Concrete tile
-
Please specify.
undefined
-
-
Roof height (specify unit of measurement)
-
Roof length (specify unit of measurement)
-
Roof half-span (specify unit of measurement)
-
Roof slope or pitch (in degrees, approx.)
-
Roof orientation
- North
- South
- East
- West
- NE - Northeast
- NW - Northwest
- SE - Southeast
- SW - Southwest
-
Other roof measurement(s)
-
Photo(s) of roof to be installed
-
Internal roof details
-
Photo(s) of internal roof
-
Level of shading
-
Are there any obvious shading issues?
-
Please specify.
-
-
Is there any evidence of asbestos in the roof material?
-
Please provide further details of the asbestos on site.
-
Please attach photos (if applicable).
-
Main AC Connection Point
-
Phase type
-
Main AC connection fuse rating (in Amps)
-
Photo(s) of main AC connection point
Inverter Location and Fixing Details
-
Describe potential battery locations on the site
-
Describe potential inverter locations on the site.
-
Attach photos of these locations.
Remote Monitoring
-
Monitoring network type
Assessment
-
Is the roof orientation of the site suitable for solar installation?
-
Is the roof slope or pitch suitable for solar installation?
-
Does the site have sufficient roof space for solar panels as designed?
-
Is the site's location conducive to solar energy production, with ample sunlight exposure throughout the year?
-
Is the site in a conservation area or a listed building requiring further permissions?
-
Is the site connected to the grid and ready for SEG?
-
Is the site's electrical system capable of accommodating the additional load from solar panels, including an appropriate main electrical panel and wiring?
-
Is the site's electrical consumption pattern suitable for solar installation, with high electricity usage during daylight hours?
Cable Runs
-
Describe AC cable run
-
Describe DC cable run
-
Any obscructions?
Management Review and Sign Off
-
Comments or observations about the site
-
Name and signature of surveyor