Title Page

  • Document number

  • Name of client/site

  • Conducted on

  • Prepared by

  • Location

Survey Proper

Site Information

  • Site/building name

  • Type of site surveyed

  • Please specify.

  • Photo of site surveyed

  • Name of site agent/manager

  • Contact information of site agent/manager

  • Energy Performance Certificate (EPC) rating

  • Number of Meter Point Administration Numbers (MPANs) on site

  • Specify the MPAN number(s) and their location(s).

Roof Information

  • Roof type

  • Roof construction

  • Please specify.

undefined

  • Roof height (specify unit of measurement)

  • Roof length (specify unit of measurement)

  • Roof half-span (specify unit of measurement)

  • Roof slope or pitch (in degrees, approx.)

  • Roof orientation

  • Other roof measurement(s)

  • Photo(s) of roof to be installed

  • Internal roof details

  • Photo(s) of internal roof

  • Level of shading

  • Are there any obvious shading issues?

  • Please specify.

  • Is there any evidence of asbestos in the roof material?

  • Please provide further details of the asbestos on site.

  • Please attach photos (if applicable).

Main AC Connection Point

  • Phase type

  • Main AC connection fuse rating (in Amps)

  • Photo(s) of main AC connection point

Inverter Location and Fixing Details

  • Describe potential battery locations on the site

  • Describe potential inverter locations on the site.

  • Attach photos of these locations.

Remote Monitoring

  • Monitoring network type

Assessment

  • Is the roof orientation of the site suitable for solar installation?

  • Is the roof slope or pitch suitable for solar installation?

  • Does the site have sufficient roof space for solar panels as designed?

  • Is the site's location conducive to solar energy production, with ample sunlight exposure throughout the year?

  • Is the site in a conservation area or a listed building requiring further permissions?

  • Is the site connected to the grid and ready for SEG?

  • Is the site's electrical system capable of accommodating the additional load from solar panels, including an appropriate main electrical panel and wiring?

  • Is the site's electrical consumption pattern suitable for solar installation, with high electricity usage during daylight hours?

Cable Runs

  • Describe AC cable run

  • Describe DC cable run

  • Any obscructions?

Management Review and Sign Off

  • Comments or observations about the site

  • Name and signature of surveyor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.