Information
-
Builder:
-
Subdivision:
-
Job Number:
-
Inspected by:
-
Location
Equipment
Recordables
-
Are there any issues?
Recordable
-
Call Type
-
Problem
- Not Ready
- Plan Conflict
- Schedule
- Schedule/Double Book
- Schedule/Dry Run
- Schedule/Late Notice
- Admin
- Engineering
- Field Super
- Field/RI
- Field/Trim
- Sales
- Service S/U
- Service Warranty
- Warehouse
- Repair
- Accuracy/Order Entry
- Accuracy/Picking
- Availability
- Quality
- Warranty/Parts
- Recordable Event
-
Notes about recordable:
-
Pictures of recordable:
Equipment
-
Porta-pads in Proper Location & Leveled.
-
Condensing Unit Level, check not damage, pressurized<br>MUST TAKE PICTURES (top of condenser & all 3 panels with the level & gage's on it)
-
Refrigerant Line Connected & Pressurized & 300 psi Pressure Test
-
3' Clearance from Walls/House/Clean-outs
-
Proper Clearance from Walls/House/Clean-outs
-
Armaflex Completed/Taped
-
Low Voltage Wire Secured
-
No Overhead Obstructions
-
Confirm Thermostat Wire Location
-
Confirm Temperature Sensor Wire
-
Confirm FRV Wire Location
-
Confirm Motorized Damper Wire Inside the Atic next to Air Handler
-
S/A Registers Installed
-
R/A Grilles Installed<br>MUST TAKE PICTURES of All Air Filters
-
Filter Racks/Filters Installed/Fresh Air Filter<br>MUST TAKE PICTURE of Fresh Air Filter
-
Combustion Air Grilles Installed with Screens
-
Exhaust Fan Trim Kits Installed
-
Hood Vent Final Connections<br>MUST TAKE PICTURE
-
Dryer Vent Trim Kit
-
Exterior Caps, Collars, Flashings Installed
-
Secondary Drain Terminated with 90 degree Elbow
-
Primary Drain Terminated with 90 degree Elbow
-
W/H Platform Lined with Metal
-
Access Doors/Panels Connected<br>MUST TAKE PICTURE
-
Job Complete per Plan
More
-
Items Corrected:
-
Notes:
Finish
-
Supervisor Signature