Rough-in
-
Take Picture/Front Page Of Work Ticket Full Size
-
Take A Photo of Just the Equipment Stickers on the Work Ticket
Recordables
-
Are there any issues?
Recordable
-
Call Type
- Builder
- SA
- Trade
- Vendor
-
Problem
- Not Ready
- Plan Conflict
- Schedule
- Schedule/Double Book
- Schedule/Dry Run
- Schedule/Late Notice
- Admin
- Engineering
- Field Super
- Field/RI
- Field/Trim
- Sales
- Service S/U
- Service Warranty
- Warehouse
- Repair
- Accuracy/Order
-
Notes about recordable
-
Pictures of recordable:
Equipment
-
Access Attic/Closet 23x30
-
Service Platform & Clearance (30"W) (24"W x 20'L)
-
Furnace Level/Hung as High as Possible
-
Coil Level 1/2" Grade to Drain Fittings/90% Furnaces 1/2"-MUST TAKE PICTURE WITH LEVEL ON IT-
-
Add media
-
Hangers Secured with Screws
-
Secondary Drain Pan Secured with Slope Towards PVC Termination-MUST TAKE PICTURE-
-
Add media
-
Drainage For 90% Equipment Install and Sealed Properly-MUST TAKE PICTURE-
-
Add media
-
Flue Vent Run Straight up Through Roof/Level/1" Clearance
-
PVC Vent Run Straight/Properly Sealed/90% Equipment
-
Roof Penetration is 24" away from valley or ridge
Refrigerant Lines
-
Soldered at Coil *No Mastic*-MUST TAKE PICTURE-
-
Add media
-
Insulated with Armaflex
-
Strapped every 5 feet
-
Spacer Block at Roof Line
-
Centered in Wall Cavity
-
Nail Plates Installed
-
Flashing at Wall Penetration/Installed Properly
-
Flashing at Celling Penetration/Installed Properly
-
Labeled Tonnage-outside-
-
Draft Stop in Walls
-
Wire run to Equipment and Secured-MUST TAKE PICTURE-
-
Add media
-
Line set Pressurize With Nitrogen to 300 Pounds-MUST TAKE PICTURE-
-
Add media
Drain Lines
-
"P" Trap Level *No Mastic at Coil Starter*-MUST TAKE PICTURE-
-
Add media
-
Pipe Run Straight-no bows-
-
Minimum 1/4" per Foot Slope
-
Strapped Every 4 Feet
-
Terminated Outside with Cap (primary)
-
Terminated over Window with Cap (secondary)
-
Nail Plates Installed
-
Draft Stop in Walls
-
Water Test
T-Tops/Caps
-
All Roof Components(T-Tops) secured together in Attic next to Equipment-MUST TAKE PICTURE-
-
Add media
-
Flue caps installed on flue pipes - MUST TAKE A PICTURE
-
Add media
Wiring
-
Thermostat Wire Installed 60" Off Floor-MUST TAKE PICTURE-
-
Add media
-
Blocked at Wall
-
Wire Run From T-stat Location to Equipment-MUST TAKE PICTURE-
-
Add media
-
Wire Connected and Run from Motorized Zone Dumper to Equipment/Secured-MUST TAKE PICTURE-
-
Add media
-
Wire Connected and Run from Fresh Air Motorized Dumper to T-stat Location -MUST TAKE PICTURE-
-
Add media
-
Wires Run from Temperature Sensors Location to T-stat Location-MUST TAKE PICTURE-
-
Add media
-
Wire Run( Jump Wire ) from T-stat Location to FRV Location-MUST TAKE PICTURE-
-
Add media
Ductwork/Flex
-
Plenums Secured, Sealed
-
Collars Sealed
-
Damper Disk Installed on all Collars/Equipment
-
Backdraft Dumper For FRESH AIR Installed Properly
-
Fresh Air Assembly (SONORAN VENT) Installed Properly-MUST TAKE A PICTURE -
-
Add media
-
Fresh air flex that is run through the roof is 24" away from any ridge or valley
-
BYPASS DAMPER Installed Properly/Correct Air Flow Direction/Arm-MUST TAKE PICTURE-
-
Add media
-
Flex Inner Liner Sealed/Panduit Straps
-
Outer Liner Panduit Straps
-
Hanging Strap Every 4 feet
-
Bends Un-restricted
-
Flex Runs Level
-
Duct Chases Draft Stop
-
Flex Clear of Roofline
-
Flex Free of Tears
-
S/A Ceiling Boxes Installed
-
R/A Boxes Installed
-
R/A Jump Ducts Installed Bedrooms
-
Flex Joint Spliced with Metal Pipe/Collar
Exhaust Fans
-
Exhaust Fans Installed Per Plan/Bath/Landry
-
Aluminum Flex Strapped Every 4 Feet
-
Terminated Through Roof Line With 4"KD Pipe/Secured With Metal Strap and 3 Screws
-
Fan termination through the roof is 24" away from any ridge or valley
-
Fan Damper Free to Close and Open
Vent Work
-
Dryer Vent Box Installed-MUST TAKE PICTURE-
-
Add media
-
Dryer Vent Box Framed by Other-MUST TAKE PICTURE-
-
Add media
-
Clean Cut Pipe in Box/Level/4" Long in D/Box
-
25 Feet Max Length 4"
-
Strapped Every 4 Feet
-
Pipe Taped *No Screws* Dryers
-
Nail/Wall Plates Installed
-
Draft Stop
-
Terminated with T-Top/Wall Cap & Damper
-
Dry vent run through the roof is 24" away from any ridge or valley
-
Hood Vent Pipe/Wall Stack Level
-
3 Screws per Joint/Mastic Sealed
-
Collar thru Wall for Sheetrock -2"
-
Terminated with T-Top/Wall Cap & Damper
-
Hood vent run through the roof is 24" away from any ridge or valley
-
Draft Stop
-
Proper Height & Location Hood Vent
Water Heater Flue Pipe
-
1" Clearance from Combustibles
-
Strapped Every 4 Feet
-
Pipe Level
-
Water heater flue pipe penetration through the roof is 24" away from any valleys or ridges
-
Insulation Standoff Installed and Secured
-
6" Below Ceiling
Other
-
Combustion Air Vents installed/12" From Floor/Ceiling
-
QUICK-FLASH Installed Properly(PVC,etc)
-
All Wall Caps Installed/Leveled/Dumpers Free/