Title Page
-
Audit Type
-
Previous engineer
-
Origianl Visit Date
-
Conducted on
-
Prepared by
-
Location
Audit Type
-
Audit Type
-
Screenshot of Mesh & Routes on arrival
-
Mk 4 Dish & Satellite Siginal Optimum
-
Correct Power Lead used? (Blue with correct lenght black lines)
-
Correct HDMI Lead used (Pink end with SKY on both sides)
-
Compression F connectors correctley fitted at dish
-
Compression F connectors correctley fitted at STB
-
Correct settings including picture to heighest resolution
-
Screenshot of Mesh & Routes once resolved
-
Any relevent information regarding how fault was resolved. eg. Booster placement,
-
Add any photos to support the above. eg. Poor quality dish/cable, Data Logger.
-
Description of fault given by customer
-
Photos of fault found
-
Mk 3 or 4 dish
-
Compression F's fitted at both dish and STB
-
Cable meets satisfactory standards
-
Brick burst and grommet fitted
-
STB connected to On Demand
-
Description of work carried out to resolve fault
-
Photos of work carried out to resolve fault
-
Visit type
-
Is this a customer driven cancellation
-
Add photos (including LOS for No LOS Cancellations)
-
Name of Team Manager/TM Cover notified
-
Has there been an onsite second opinion
-
Name of onsite second opinion
-
Cancellation code given by RST
-
Any comments to support cancellation
-
Engineer