Audit

Contractor acknowledges proper insurance, certification, licensure

Add media

Adequate barriers in place

Add media

Weight of load being lifted is within manufacturer limitations of crane

Add media

Load weight

Add media

Maximum crane lift

Add media

Span of lift

Add media

Rigging is appropiate

Add media

Overhead wires

Add media

Overhead obstacles

Add media

Interim Life Safety Measures (ILSM) in place, if needed

Add media

Contractors trained regarding ILSM

Add media

Temporary Fire Prevention in place

Add media

Contractor aware of egress route

Add media

Traffic control required

Add media

All exits clear

Add media

Free access to Emergency Services

Add media

Alternate routes for public and Emergency use

Add media

Additional Firefighting staff and equipment available

Add media

Smoking is strictly prohibited

Add media

Construction site clean and orderly

Add media

Contractors are informed if adjacent areas are affected

Add media

Construction site access restricted

Add media

Effective site storage of materials and equipment

Add media

Fire zones maintained, contractors aware of changes

Add media

Will there be any noise and vibration risk? ("Noise and Vibration Risk Assessment" form required if answered "Yes")

Add media
Select date
Add signature
Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.