Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Contractor acknowledges proper insurance, certification, licensure

  • Add media

  • Adequate barriers, cones, safety tape in place as necessary.

  • Add media

  • Ceilings will be closed during breaks, meals, or for any period longer than 30 minutes in duration

  • Add media

  • If tile removed in High Risk areas (ICU, Nursery, NICU, etc.) containment is required

  • Add media

  • PCRA/ ICRA required

  • Add media

  • Map identifying work area(s) submitted prior to permit issuance

  • Add media

  • Penetrations required/ permit issued

  • Add media

  • Dust containment in proper working order with HEPA negative pressure

  • Add media

  • Per-existing conditions identified

  • Add media

  • Interim Life Safety Measures in place, if necessary

  • Add media

  • Contractors trained regarding ILSM

  • Add media

  • No cables or supports on sprinkler pipe

  • Add media

  • Contractors aware of egress routes

  • Add media

  • Disruption to facility kept at a minimum in high-traffic areas

  • Add media

  • All exits clear

  • Add media

  • Free access to Emergency Services

  • Add media

  • Alternate routes for public and emergency use

  • Add media

  • Additional firefighting staff and equipment available in conjunction with "Hot Work" permit if performing any work above ceiling

  • Add media

  • Smoking is strictly prohibited

  • Add media

  • Construction site clean and orderly

  • Add media

  • Contractors are informed if adjacent areas affected

  • Add media

  • Proper ladders/ scaffolding in use

  • Add media

  • Effective site storage of materials and equipment

  • Add media

  • Fire zones maintained, contractors aware of changes

  • Add media

  • Will there be any Noise and Vibration Risks? (Noise and Vibration Risk Assessment" form required if answered "Yes")

  • Add media

  • Select date

  • Add signature

After completion of work, inspections SHALL be scheduled with a representative of Facility Engineering prior to job closure and final approval. Any deficiencies will be corrected by contractor within three (3) business days after notification of deficiency. If no corrective action for the non-compliant work is made, South Austin Medical Center will make the appropriate corrections at market cost ($30.00/ Hr labor, plus material) and invoice the deficient party.

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.