Information
-
Job Name
-
PO#
-
Document No.
-
Conducted on
-
Prepared by
-
Location
Contractors Used on Project
-
Aluminum Plus
-
Federal Heath
-
Guardian
MID
-
Is the Main ID correct and functioning?
-
Is the MID correctly painted?
Highrise
-
Is the Highrise correct?
Canopy
-
Is the Canopy branded correctly?
-
Is the forecourt area clean and painted correctly?
-
Are all lights working on the canopy (fascia and deck)?
-
Are the pumps clean and branded correctly?
-
Is the island refreshed correctly if applicable?
-
Is POP and Credit card Hardware installed?
-
Are amenities placed correct and stocked?
Building
-
Is the building clean and properly painted?
-
Are the door/window decals correct?
-
Are trash cans correct?
Perimeter
-
Are light poles, bollards and vents painted correctly?
-
Is the perimeter curbing correct?
-
Did the site get seal coated correctly?
-
Is the parking lot striped correctly?
POS installation Brand change
-
Is everything working correctly?
-
Was training completed?
Customer Experience
-
Was the construction conducted within 90 days?
-
Feedback for Southeast Petro
Acknowledgements
-
Type any notes here.
-
By signing below, you are accepting the project as complete as long as the punch list items above are addressed.
-
Store Attendant Signature
-
Southeast Petro Representative Signature