Title Page

  • Sovereign Construction - Permit to Work

Application for a Permit to carry out essential works on HHGL Limited T/A Homebase Estates

  • The permit must be available at the work site and returned to the authorised site representative on completion of work for sign off and filing. Please print clearly in BLOCK CAPITALS.

  • Homebase Site Name

  • Site Number

  • WON/PO

  • Contact Name/Number

  • Location working on site

  • Please Specify

  • Contact Tel No

  • Name of all operatives on site

  • Description of work

  • Equipment to be used

Contractor to complete the following for all work

  • I have read and understood the fire evacuation process for the is building including assembly point and how to raise the alarm

  • I confirm that I and my team are trained and competent for the work I am to undertake

Work Permits

  • Work Permits

Contractor to complete the following for all working at height or roof work

  • Is a working at height/roof work permit required?

  • I will ensure that there is safe access and egress before commencing the work

  • I have checked roof plans / risk assessments for fragile surfaces / edge protection and other existing hazards (roof work only)

  • I have confirmed that the weather conditions are suitable for the work I am to undertake (outside work only)

  • I have a suitable rescue plan in place that is trained and understood by all working in my team, this will be amended to suit the needs of the site before works commence

  • I am familiar and competent to use the roof access equipment ie lanyard and all statutory inspections are in date

  • I confirm that suitable barriers will be erected to ensure that nothing can fall onto people / property below the working area

Contractor to complete for confined spaces

  • Is a confined spaces permit required?

  • I can confirm that checks will be made prior to entry for fumes / flammable atmosphere I-gas

  • I confirm that people attending this job are trained in rescue from confined spaces and before the job commences a rescue plan will be in place

  • I have a suitable means of communication for those in the confined space

  • Contractor to complete the following for electrical work

Contractor to complete the following for electrical work

  • Is a Electrical permit required?

  • I confirm that all apparatus in the area specified is dead, isolated from all live conductors and is connected to earth

  • I have posted warning notices as applicable.

  • State where

  • I confirm that I understand general Electrical Safety Procedures and I will follow them whilst working

  • I confirm I have fitted safety locks.

  • State where

Contractor to complete the following for all hot works

  • Is a hot works permit required?

  • I confirm that the work area will be adequately ventilated

  • I have or will make arrangements for the smoke detectors to be isolated in the work area and Impairment Procedures followed and will return them to full service after the works have ceased

  • I will have a minimum of 2 fire extinguishers available in the working area and I am trained in their use

  • I will complete a mandatory fire watch for 60 mins post works

  • I will ensure that all surrounding areas are clear from rubbish, have been swept clean and are free from combustible materials and or are wetted down as appropriate

  • I have confirmed that all stock, plant and machinery within 1 Om (including underneath any mezzanine levels) will be protected from heat and sparks with non-combustible curtains, metal guards or flame proof covers

  • I will ensure that warning notices have been posted as applicable

Contractor to confirm all hot works have ceased and a fire watch commenced at

  • Is fire watch required?

  • Start of fire watch

  • Company

  • Position

  • Signature

  • Date & Time

  • Finish of fire watch

  • Company

  • Position

  • Signature

  • Date & Time

Contractor to complete the following for all excavations

  • Is a excavations permit required?

  • I confirm that prior to work commencing physical checks will be made for underground services

  • I confirm that I will make provision to prevent people and equipment from falling into any hole / trench and that the area will be securely fenced off

  • I confirm I will make suitable provision to prevent any trench from collapsing

Additional Hazards Identified with Control Measures Implemented

  • Hazard Identified

  • Risk

  • Control Measures

  • Responsibility

  • Hazard Identified

  • Risk

  • Control Measures

  • Responsibility

  • Hazard Identified

  • Risk

  • Control Measures

  • Responsibility

Authorisation and Sign off Section

  • Authorisation and Sign off Section

Authorisation by HHGL Limited T/A Homebase Estates (Before Works Start)

  • The above work is authorised to proceed on the provision that the procedures above are maintained for the duration of the work and therefore issue any keys or access to required areas.

  • Signed

  • Position

  • Before Photos - Minimum of 2

  • After Photos - Minimum of 2

Contractor Works Completed & Areas Safe

  • The work area has been inspected, left clean and tidy and can be signed back into general use. Any keys Issued have been returned.

  • Contractor Signed

Authorised Completion by HHGL Limited T/A Homebase Estates

  • The above works have been completed and any keys issued to required areas, have been returned.

  • Signed

  • Position

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.