Title Page

  • Site conducted

  • Project Name

  • Site location
  • Principal contractor name

  • Site Manager name

  • Person carrying out the audit

  • Date/time of audit

  • Pass or Fail

Contractors/sub-contractors on site

  • 1. Name

  • 2. Name

  • 3. Name

  • 4. Name

  • 5. Name

  • 6. Name

  • 7. Name

  • 8. Name

  • 9. Name

  • 10. Name

Notices displayed

  • 1.1 Health & Safety Law poster

  • 1.2 SHE policy statements

  • 1.3 Employers liability insurance

  • 1.4 Suitable site signage

  • 1.5 Hazard board

  • 1.6 Construction Phase Plan

  • 1.7 First Aider(s)

  • 1.8 Project Notices (e.g. F10)

  • 1.9 Site rules

Registers

  • 2.1 Scaffolding

  • 2.2 Excavations

  • 2.3 Lifting Appliances

  • 2.4 Ladder Register

  • 2.5 Permit Register

  • 2.6 PUWER Register

  • 2.7 Existing Service Drawings

SHE Documentation

  • 3.1 Reviews

  • 3.2 Risk Assessments

  • 3.3 Site Inductions

  • 3.4 Sample Risk Assessment Briefings

  • 3.5 Sample Risk Assessment Application

  • 3.6 SHE Organisation Chart

  • 3.7 Manual Handling Assessment

  • 3.8 Signing in Register

Welfare

  • 4.1 Canteen

  • 4.2 Drying Room

  • 4.3 Toilets

Site Entry

  • 5.1 Safety of Traffic

  • 5.2 Safety of Public

  • 5.3 Relevant Site Signage (External)

Site Tidiness

  • 6.1 Perimeter Hoarding

  • 6.2 Fencing

  • 6.3 General

  • 6.4 Work Areas

  • 6.5 Waste Area

  • 6.6 Storage Area

Fire Precautions

  • 7.1 Office Extinguishers

  • 7.2 Workplace Extinguishers

  • 7.3 Hot Works Permits

  • 7.4 Conditions on Site

  • 7.5 Storage of Flammables

  • 7.6 Fire Plan

  • 7.7 FRA Checklist

  • 7.8 Means of Escape

  • 7.9 Statutory Signs

PPE

  • 8.1 Safety Helmets

  • 8.2 Footwear

  • 8.3 Hi-Viz

  • 8.4 As Per Risk Assessment

COSHH

  • 9.1 COSHH Assessments

  • 9.2 Sample Assessment Briefings

  • 9.3 Sample Assessment Application

Plant

  • 10.1 Planning

  • 10.2 Competent Personnel

  • 10.3 Traffic Management

  • 10.4 Guarding Arrangements

  • 10.5 Vehicle Checks

  • 10.6 Examination Certificate

  • 10.7 Safe Use

  • 10.8 Condition of Lifting Gear

  • 10.9 Suitability & Specific PPE

Excavations

  • 11.1 Planning

  • 11.2 Provision of Service Locators

  • 11.3 Access into Excavations

  • 11.4 Edge Protection

  • 11.5 Shoring & Battering

  • 11.6 Competent Workforce

  • 11.7 Temporary Works Assessment

  • 11.8 Safe Working Procedure

Electrics

  • 12.1 Cabin Test Certificates

  • 12.2 Overhead Lines Identified

  • 12.3 Storage & Use of Power Tools

  • 12.4 Condition of Electrical Equipment

  • 12.5 Competent Persons

  • 12.6 Work Permit Procedure

  • 12.7 Existing Services & New Connections

Work At Height

  • 13.1 Planning

  • 13.2 Ladder Access

  • 13.3 Scaffolding General

  • 13.4 Towers & Platforms

  • 13.5 TG20 Compliance Sheets/Design

  • 13.6 Competent Persons

  • 13.7 Other Precautions (MEWPS etc..)

  • 13.8 Temporary Works Assessment

  • 13.9 Recorded Inspections

Floor Openings

  • 14.1 Planning

  • 14.2 Provision of Protection

  • 14.3 Relevant Signage

Confined Spaces

  • 15.1 Planning

  • 15.2 Gas Detection Equipment

  • 15.3 Rescue Equipment

  • 15.4 Competent Persons

Site Management

  • 16.1 Resources

  • 16.2 Monitoring

  • 16.3 Action on Safety

  • 16.4 Promotion of Health & Safety

Public Interface

  • 17.1 Safety of The Public

  • 17.2 Safety of Staff & Adjacent Users

  • 17.3 Public Information

  • 17.4 Public Interface

  • 17.5 Traffic Management

  • 17.6 Highway Cleanliness

  • 17.7 Staff Information

  • 17.8 Visitor Safety

Waste

  • 18.1 Provision of Skips

  • 18.2 Instructions on Disposal

  • 18.3 Use of Registered Waste Carrier

  • 18.4 Waste Transfer/Consignment Notes

  • 18.5 Recycling Materials

  • 18.6 Waste Management Plan & Policy

  • 18.7 Waste Minimisation

  • 18.8 Identification of Special Wastes

Noise

  • 19.1 Identification of Sources

  • 19.2 Engagement with Public/Residents

  • 19.3 Monitoring

Occupational Health

  • 20.1 Vibration Information

  • 20.2 Dust/Respiratory Information

  • 20.3 Cancer Information

  • 20.4 Manual Handling Information

  • 20.5 Leptospirosis Information

  • 20.6 Hearing Information

  • 20.7 Dermatitis Information

Training

  • 21.1 Management Competency

  • 21.2 Staff

  • 21.3 Sub-Contractors

  • 21.4 Training Programme

  • 21.5 Competency Certificates

  • 21.6 Toolbox Talks

Asbestos

  • 22.1 Surveys/Register

  • 22.2 Briefing

  • 22.3 Monitoring

  • 22.4 Management of ACM Discovery

Comments/Notes

  • Comments and Notes for Audit

Untitled page

  • Audit Completed by

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.