Title Page
-
Site conducted
-
Tilcon Connecticut Inc.- Plainville Facility
-
Spill Prevention Control and Countermeasure (SPCC) Plan
-
Stormwater Pollution Prevention Plan (SWP3)
-
Tilcon personnel should conduct a detailed inspection of the entire facility once per month. the monthly inspections log identifies the principal ares, systems, and equipment that should be evaluated, at a minimum to meet the SPCC/SWP3 inspection requirements. A check should be placed (either "OK" or "Corrective Action Needed") next to each item evaluated. Where corrective action(s) is/are required, facility personnel should complete a Corrective Action Form. The inspector should sign and date this log immediately upon completion of the inspection.
-
Employee Name:
1.0 Above-Ground Storage
-
-
(Above-Ground Storage Tank inspections for oil/petroleum products are performed on a monthly basis using the Steel Tank Institute (STI) forms that are included in Appendix M of the SPCC/SWP3 Plan. The consolidated findings should be identified here as acceptable "OK" or as not acceptable "Corrective Action Needed". If corrective action is required, a Multi-media Corrective Action Form should be completed.
2.0 Secondary Containment Structures
-
-
(Above-Ground Storage Tank inspections for oil/petroleum products are performed on a monthly basis using the Steel Tank Institute (STI) forms that are included in Appendix M of the SPCC/SWP3 Plan. The consolidated findings should be identified here as acceptable "OK" or as not acceptable "Corrective Action Needed". If corrective action is required, a Multi-media Corrective Action Form should be completed.
3.0 Miscellaneous
-
Housekeeping (trash,rags,etc.)
-
Miscellaneous chemical storage
-
Vegetation (fire hazard)
4.0 Security
-
Entrance/exit gates (operational, locks)
-
Lighting (operational)
5.0 Communication Equipment
-
Telephones
-
Handheld radios (operational, charged, location)
6.0 Spill Response Equipment
-
A. Sorbents (Pads, Spedi-Dry)
-
If corrected action is needed: select which categories apply:
- Inventory
- Storage Location
- Accessibility
- Operational Status
- Testing/Actual Use
- Shelf Life
-
B. hand Tools (Maintenance Garage)
-
If corrected action is needed: select which categories apply:
- Inventory
- Storage Location
- Accessibility
- Operational Status
- Testing/Actual Use
- Shelf Life
-
C. Communication Equipment
-
If corrected action is needed: select which categories apply:
- Inventory
- Storage Location
- Accessibility
- Operational Status
- Testing/Actual Use
- Shelf Life
-
D. Fire Fighting and Personal Protective Equipment
-
If corrected action is needed: select which categories apply:
- Inventory
- Storage Location
- Accessibility
- Operational Status
- Testing/Actual Use
- Shelf Life
7.0 Fire Protection Response Equipment
-
Water hydrants
-
Extinguishers
8.0 Product Transfer Piping
-
Signs of product leakage (droplets of product, discoloration, stains)
-
Condition (rust,corrosion)
-
Valves
9.0 Drainage System
-
Drainage Swale (to small on-site ponds)
-
On-Site Ponds
Above-Ground Storage Tank Inspection
T-24
1.0 Tank Containment
-
1.1 Containment Structure
-
1.2 Primary Tank
-
1.3 Containment Drain Valves
-
1.4 Pathways and Entry
2.0 Leak Detection
-
2.1 Tank
-
2.2 Secondary Containment
-
2.3 Surrounding Soil
-
2.4 Interstice
3.0 Tank Equipment
-
3.1 Valves
-
3.2 Spill Containment Boxes
-
3.3 Liquid Level Equipment
-
3.4 Overfill Equipment
4.0 Tank Attachments and Appurtenances
-
4.1 Ladders and Platforms
5.0 Other Conditions
-
if there are other conditions that should be addressed for continues safe operation or that may affect the SPCC plan explain in comments section.
-
Comments: