Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Are all Exits, Corridors and pathways clear and unobstructed?
-
Are there clear exits from inside the job site, that are accessible and clear?
-
Are all Portable Fire Extinguishers (PFE) in place and operational?
-
How Many PFE are onsite, or within the confines of the work area?
-
All Hospital Fire Protection systems are operational?
-
All Smoke Detectors have been replaced with Heat Detectors?
-
All Manual Pull stations are Clear and Unobstructed?
-
All Debris/Trash is removed and/or organized from the previous day?
-
Trash being removed from site is in a clean and covered container?
-
Wet/ Dry Mats are placed within the confines of the workplace, and Sticky Mats are placed at exterior to prevent dust and dirt from exiting the worksite?
-
All Flammable Liquids are stored appropriately, except when being used?
-
All Hot Work Permits are in place and current to work being performed?
-
The Integrity of the construction site partitions are maintained?
-
No Smoking/ No Tobacco (Including E-cig, Smokeless) On Campus policy is being adhered to?
-
Access to the site is restricted to the public (Except for emergency responders?)
-
A minimum of one entrance has a maintainable key core for key personnel to enter after hours?