Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Guide to Content:
- Permits authorised by correct permit signatories.
- Hazard ID and Control/RA’s of adequate quality.
- Permit Signatories are current in the PTW Register.
- Permits are legible
- The Permit Area office is being managed in accordance with the HSSE Mgmt Manual (PTW included).
-
Auditors Name
-
Permit No. Permit Type
-
DETAILED DESCRIPTION OF WORK:
-
ENDORSEMENT – Select one current permit
-
1:Have the Permit Signatories undergone the required training and are their competencies valid in the Vantage Register?<br>YES / NO<br> <br> <br>
-
2; Have the Permit Signatory and Area Engineer / Supervisor correctly endorsed the Permit<br> <br> <br>
-
3;Is the Permit Holder fully aware of their duties? Discuss to establish level of understanding<br> <br> <br>
-
4: Is the Area Engineer / Supervisor aware of all work in the area that may conflict with this Permit? Discuss to establish level of understanding.<br> <br> <br>
-
2. CONTROLS
-
1 Is the Supervisor or Lead Man physically at the work location?
-
2 Have all of the work party completed the required Clark training ?
-
3 Has the Take 5 been given by the Supervisor before the start of each shift and do the work party understand the location specific hazards for the day?
-
4 Is the RA/Hazard ID of adequate quality?
-
5 Have appropriate checklists written in the permit been correctly processed?
-
6 Are the work party fully briefed on the Hazard ID, RA, or Take 5 requirements for the job?
-
7 Has an authorized person carried out the required gas and continuity tests correctly and at the correct frequency? Is the gas detector within calibration dates?
-
8 Are the isolations applied appropriate for the work being performed?
-
9 Are the appropriate controls being applied in the field for the work being carried out?
-
10 Are all PPE in place and being worn properly by the worker group?
-
11 Is safe drinking water freely available within 2 minutes walk?
-
3. GENERAL
-
1 Is the permit appropriately kept in the Permit Area Office and displayed permit site boards at the work site?
-
2 Does the permit clearly describe the work location and the scope of work (task) ? Are the work details clearly defined?
-
3;Are there <10 workers per supervisor and lead man for this job?
-
4 Is the type of Permit correct for the work scope?
-
5 If there have been any modifications to the permit have they been countersigned by a person of the same level of authority as the person who authorized the permit?
-
6 Have any associated isolations been correctly processed, displayed and the relevant isolation schematics updated?
-
7 Have measures been put in place to remove any risks or unsafe conditions or potential conflicts with other work parties/activities?
-
Number of items audited
-
undefined
-
Number of items complying
-
undefined
-
Compliance factor
-
undefined