Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Spiire NBN Audit
-
Spiire NBN Preliminary As Built Inspection
-
SPIIRE Project Reference No:
-
NBN Pit & Pipe Construction Contractor
Site Observations
-
Is heavy machinery present ?
-
Weather Conditions
-
Ground Conditions
-
Site is easily accessible ?
-
As-built locations of pits accurate to design plans
-
Footpaths complete ?
-
Trafficable roads complete ?
-
Pit protection is in place ?
Lid Inspection
-
NBN stamps used and weight information visible ?
-
Lid "Key holes" free from debris ?
-
Lids are whole without exposed reo ?
-
Lids sitting flush in pits ?
-
Lid are free of visible damage ?
-
Additional Comments:
-
Add media
Pit Inspection
-
Finished on ground / FS level OR on grade with footpath formwork if path incomplete ?
-
All pits have gasket covers used ?
-
Pits free from visible damage to pit casing ?
-
Pits Free of debris ?
-
Crushed rock bedding/based compaction applied (prior to finished ground level) ?
-
Spreader bars used (if applicable) ?
-
Additional Comments:
-
Add media
Conduit Inspection
-
Appropriate bedding and compaction applied ?
-
Bush flush with internal pit wall ?
-
Correct separation between conduits applied ?
-
No visible damage to bushes
-
Draw rope / chord installed ?
-
All lead in conduits are tagged and labeled ?
-
Plugs/end caps used ?
-
Connectivity to next stage installed (where applicable) ?
-
Additional Comments:
-
Add media
Inspection Photos
-
Photo Comments:
-
Add media
Signature of Auditor:
-
Add signature