  • General Construction Audit

  • Site conditions

  • Weather

OH&S

  • PPE used as SMP & site boards?

  • Barriers & Signs in accordance with contractors T.M.P/P.M.P?

  • Traffic control measures in place as required?

  • Are trenches and excavations in accordance with Worksafe practices?

  • Is the site fencing and signage to a satisfactory level?

  • Excavation safety in accordance with contractors P.M.P?

  • Are known no-go zones identified?

  • Are machinery operating outside no go zones?

  • Have OH&S issues previously identified been rectified?

SMP & EMP

  • Are EMP measures in place as per the EMP plan

  • Is dust suppression in place

  • Is entry and exit point as per contractors TMP

  • Is fuel and spill kit area being used

Site Establishment

  • Percentage complete

  • Initial survey control completed? Ie. pegging, TBM's etc.

Stripping of Topsoil

  • Percentage Complete

Sewer Reticulation

  • Has the sewer reticulation commenced?

  • Commencement date

  • Percentage Complete

  • Contractor on programme?

  • Testing undertaken and passed?

  • Asset recording completed and relevant contractor documentation received?

  • Construction Verification Information submitted?

  • Scheduled commencement date

  • Pre-construction documents lodged with relevant water authority?

Stormwater Drainage

  • Has the stormwater drainage commenced?

  • Percentage Complete

  • Enter works complete

  • Enter section being worked on and inspected

  • Contractor on programme?

  • Has the bedding material been installed as per authority specification?

  • Specify

  • Is pipe jointing as per authority requirements

  • Is pipe type & diameter as specified on drainage longitudinal sections

  • Drainage pipe backfilled as specified in the drainage longitudinal sections

  • Are drainage pits constructed as documented in drainage pit schedule

  • Have the house drains and property inlets been constructed?

  • Final survey completed and submitted to Council?

Water Reticulation

  • Has the water reticulation commenced?

  • Commencement date

  • Percentage Complete

  • Contractor on programme?

  • Have the mains to meters been completed?

  • Testing undertaken and passed?

  • Has connection and asset recording been completed and relevant documents received?

  • Construction verification information lodged with relevant authority?

  • Scheduled commencement date

  • Pre-construction documents lodged with relevant water authority?

Road Pavement Construction

  • Has the road pavement commenced?

  • Commencement date

  • Percentage complete

  • Has all the pavement been excavated to design subgrade?

  • Enter extent complete

  • Has the subgrade passed local authority proof roll?

  • Were subgrade improvement works necessary?

  • Enter extent of subgrade improvement works required

  • Has the capping layer been completed if required?

  • Enter extent of works complete

  • Have all the AG drains been installed as specified by authority standards

  • Percentage complete

  • Have the conduits for road crossings been installed?

  • Enter extent of works complete

  • Has the sub-base pavement been constructed to beneath kerb & channel?

  • Enter extent of works complete

  • Has the Kerb & Channel been constructed?

  • Enter chainages/areas of works complete

  • Has the pavement base been constructed?

  • Enter chainages of complete works

  • Has the prime been completed?

  • Has the base course asphalt been laid?

  • Enter extents of works complete

  • Has the final wearing course asphalt been laid?

  • Enter extents of works complete

  • Contractor on programme?

  • Scheduled commencement date

Structural

  • Are there any structural elements?

  • Have the culverts commenced?

  • Commencement date

  • Percentage Complete

  • Contractor on programme?

  • Has the excavation been completed?

  • Is the foundation completed and as per design?

  • Is the blinding layer completed?

  • Has the base slab been completed?

  • Have the culverts been delivered? And are they as per design specifications?

  • Have the culverts been installed correctly

  • Are there link slabs? Is so, have they been installed correctly?

  • Has the mass concrete over culverts been poured?

  • Has the backfill over culverts been completed?

  • Scheduled commencement date

  • Have the Retaining Walls commenced?

  • Commencement date

  • Percentage Complete

  • Contractor on programme?

  • Has the excavation been completed?

  • Is the foundation completed and as per design?

  • Is the blinding layer completed?

  • Has the base slab been completed?

  • Has the retaining wall been completed and as per design?

  • Scheduled commencement date

  • Have the Specially Designed Pits commenced?

  • Commencement date

  • Percentage Complete

  • Contractor on programme?

  • Scheduled commencement date

  • Enter description of other works

  • Has the Other works commenced?

  • Commencement date

  • Percentage Complete

  • Contractor on programme?

  • Scheduled commencement date

Electrical works

  • Have the electrical works commenced?

  • Commencement date

  • Percentage Complete

  • Electrical pits concrete encased?

  • Pegging completed? (Required for audit)

  • Audit date

  • Has the final audit passed?

  • NOTE: Landscaping works not to commence yet!!

  • Scheduled date

  • Contractor on programme?

  • Scheduled commencement date

Communications works

  • Have the communications works commenced?

  • Commencement date

  • Percentage Complete

  • As built information received from contractor?

  • Submitted to NBN designer?

  • Submitted to NBN?

  • Contractor on programme?

  • Scheduled commencement date

Traffic Signals

  • Are there traffic signals required on this project?

  • Have the works commenced yet?

  • Commencement date

  • Percentage Complete

  • Contractor on programme?

  • Scheduled commencement date

Construction of footpath and crossings

  • Has the construction of footpaths and crossings commenced?

  • Percentage Complete

  • Contractor on programme?

  • Scheduled commencement date

Grade lots/topsoil

  • Has the grading/topsoiling commenced?

  • Commencement date

  • Percentage Complete

  • Contractor on programme?

  • Scheduled commencement date

Linemarking and signage

  • Has the linemarking and signage commenced?

  • Commencement date

  • Percentage Complete

  • Scheduled commencement date

Auxiliary Works

  • Are there auxiliary works associated with the project?

  • Enter extent/description of auxiliary works

  • Percentage Complete

Key action items completed since last site meeting

  • Enter status of key actions

Incidentals

  • Select summary of plant on site

  • Enter additional plant

  • Enter summary of works ongoing

  • additional comments

  • Please sign off once audit is completed

  • Add photos

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.