Title Page
-
Company:
- Borton
- Greenhill Concrete
- Greenhill Materials
- Greenhill Sand
- Klaver
- Millennial Asphalt
- OCM
- Sherwood Construction
- Wildcat CO
- Wildcat KS
- Wildcat Concrete
-
Site conducted
-
Person Reporting:
-
Project Name / Number:
-
Project Supervisor:
-
Conducted on
Company Reponsible
-
Name:
-
Address:
-
Contact Name:
-
Phone Number:
Spill Information
-
Date and Time of Spill:
-
Quantity spilled:
-
Duration of spill (if known):
-
Reportable quantity?
-
Location of spill/release:
-
Material spilled:
-
Describe the circumstances leading to the spill/release:
-
Release originated from:
- Tank
- Secondary containment
- Piping
- Spill bucket
- Dispenser
- Piping sump
- Fitting or pipe connection
- Valve
- Semi Truck
- Vehicle
- Equipment
- Pipeline
- Drum
- Unknown
-
Photo of spill/release
-
Cause of spill/release:
- Spill
- Overfill
- Corrosion
- Metal Fatigue
- Puncture
- Material failure (crack, split, etc.)
- Improper installation
- Loose connection
- Collision
- Vehicle accident
- Equipment accident
- Fire / explosion
- Vandalism
- Weather
- Human error
- Unknown
-
Did spill/release reach waterways?
-
Surface waters (include name of pond, lake, stream, creek, etc.)
-
Drain connected to sanitary sewer (include name of street/intersection of drain)
-
Drain connected to storm sewer (include name of water body it discharges into)
-
Groundwater (include name of aquifer, if known)
-
List immediate actions taken to stop / control / contain the spill
-
Quantity contained or recovered:
-
Method of disposal:
-
Entities notified
- Office
- Fire Department
- Owner
- Managing Company
- Colorado Department of Health
- El Paso County
- EPA
-
Recommendations to prevent reoccurrence:
-
Was anyone injured?
-
Where was employee taken?
-
Was the safety department notified?
-
Signature
-
Date of Report