Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Sprinkler Pump Set

  • Is the main valve secured in open position

  • Pressure above alarm valve (before testing)

  • Pressure below main valve ( before testing )

  • Pressure on towns main or primary supply ( before testing )

  • Pressure at which the alarm goes off (after opening test valve)

  • Is the alarm valve and gong in working order

  • Pressure above alarm valve at full flow (testing)

  • Pressure below main valve at full flow ( testing )

  • Pressure on towns main or primary supply at full flow ( testing )

  • Status of the tank

  • Has the valves been serviced

Pump House

  • Hour meter before testing

  • Diesel Fire Pump Controller System

  • Jockey pump pressure (before test)

  • Diesel pump pressure ( before test ) - Main

  • Diesel pump pressure ( before test ) - backup

  • Test engine for 15 minutes

  • Jockey pump pressure (after test)

  • Diesel pump pressure ( after test ) - Main

  • Diesel pump pressure ( after test ) - backup

  • Hour meter after testing

  • Diesel tank full

  • Security Supervisor

  • Facilities Management

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.