Title Page

  • Annual SPS Mechanical Maintenance Report

  • Site Name

  • Conducted on

  • Location
  • Safety barricades erected?

1 - General Information

  • Notify Duty Operator

  • Pump 1 Control Position

  • Pump 2 Control Position

  • Pump 1 Run Hour Reading

  • Pump 2 Run Hour Reading

  • Overall site condition (1 good, 5 bad)

  • Site Overview

  • Site Odour?

  • Details

2 - Safety

  • Road signage erected?

  • Is entry into the wet well required?

  • Procedure AS2865 and Toowoomba Region SOP for Confined Space Safety is to be followed.

3 - Pumps

  • Open wet well access lids and restrain

3.1 - Pump 1 Inspection and Clean

  • Is there excessive fats / sludge build up within the wet well(s) ?

  • Details

  • Photo

  • Inspect lifting chains, guide rails and attachments for corrosion

  • Isolate Pump 1 and raise from the wet well

  • Does there appear to be any ragging issues?

  • Please take a photo of the ragging

  • Hose down / clean Pump 1

  • Pump 1 overall physical condition (1 good, 5 bad)

  • Condition of impeller, wear rings and retaining screw (1 good, 5 bad)

  • Did the cutter require adjustment?

  • Any oil / coolant leakage or contamination ?

  • Coolant / Oil used

  • Photo of Pump 1

  • Lower Pump 1, reseat and test for correct sealing

3.2 - Pump 2 Inspection and Clean

  • Inspect lifting chains, guide rails and attachments for corrosion

  • Isolate Pump 2 and raise from the wet well

  • Does there appear to be any ragging issues?

  • Please take a photo of the ragging

  • Hose down / clean Pump 2

  • Pump 2 overall physical condition (1 good, 5 bad)

  • Condition of impeller, wear rings and retaining screw (1 good, 5 bad)

  • Did the cutter require adjustment?

  • Any oil / coolant leakage or contamination ?

  • Coolant / Oil used:

  • Photo of Pump 2

  • Lower Pump 2, reseat and test for correct sealing

  • Close wet well access lid

4 - Valves

  • Open valve pit access lids

  • Confined space entry required?

  • Procedure AS2865 and Toowoomba Region SOP for Confined Space Safety is to be followed.

4.1 - Valve Set 1

  • Close gate valve, start Pump 1 and lift reflux arm.

  • Turn off Pump 1 and lower reflux arm

  • Remove reflux valve cover and remove foreign matter from valve

  • Did the reflux disk require replacement?

  • Valve Model

  • Disk diameter

  • Service spindle and check flap seating

  • Refit reflux valve cover

  • Inspect all bolts and replace as required

  • Overall Valve Set 1 condition (1 good, 5 bad)

  • Open gate valve and test run Pump 1 on manual

4.2 - Valve Set 2

  • Close gate valve, start Pump 2 and lift reflux arm.

  • Turn off Pump 2 and lower reflux arm

  • Remove reflux valve cover and remove foreign matter from valve

  • Did the reflux disk require replacement?

  • Valve Model

  • Disk diameter

  • Service spindle and check flap seating

  • Refit reflux valve cover

  • Inspect all bolts and replace as required

  • Overall Valve Set 2 condition (1 good, 5 bad)

  • Open gate valve and test run Pump 2 on manual

  • Close valve pit access lids

5 - Site Checks

  • Return Pumps to original control position as stated in Section 1 - General Information

  • Hygienically clean site

  • Safety barricades removed?

  • Road Signage removed?

  • Site Security

  • Other Comments:

  • Other Photos

6 - Personnel

  • Leading Tradesman

  • Tradesman

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.