Location

  • Conducted on

  • Prepared by

  • Location

Main checklist

  • Client Name and Site

  • Time and Date of Inspection

  • Area Being Inspected

  • Names Of persons Present:

Decking

  • Is decking Visible

  • Decking Type

  • Condition Of decking

  • Decking installed correctly

Vapour Check

  • Is it currently visible

  • Type of VCL

  • Condition of VCL

  • VCL installed Correctly

Insulation

  • is it currently visible

  • Type of Insulation

  • Condition of Insulation

  • Has it been Installed Correctly

Membrane

  • Is Membrane visible

  • Condition of Membrane

  • Has it been correctly installed

Liquid Membrane

  • Is decking visible

  • Condition of decking

  • Bonding Layer

  • Vapour Layer

  • Insulation layer

  • Preparation membrane layer

  • polimar EC layer

  • Polimar GRF reinforcement Layer

  • Polimar uv top layer

  • All reinforcement correctly installed

Hot Melt

  • Condition of decking

  • Peel Test carried out (stop Point)

  • Primer

  • Hotmelt

  • Depth Test Carried out

  • Protection Layer

Protection And Walkways

  • Type of protection layer

  • Condition of Protection layer

  • Has it been Correctly installed

Metal Profiles and Details

  • Type of detail

  • Condition of Installed metals

  • Metals installed correctly

Mansafe and Guardrails

  • Mansafe / guardrails fully installed and complete

  • Mansafe / guardrails signed off and certs obtained

Ancillaries

  • Type of Ancillary

  • Condition of Items

  • Items Installed Correctly

Fascia / Soffitt details

  • Condition of Fascia / Soffitt

  • Facia / Soffitt installed correctly

Cappings

  • Type of Cappings

  • Cappings installed correctly

  • Condition of Cappings

Rainwater Goods

  • Type of rainwater Goods

  • Rainwater goods installed correctly

  • Condition of Rainwater Goods

Tiling/slating

  • VCL Correctly Laid

  • Insulation Fixed Correctly

  • Battons correctly installed and correct centres.

  • Breather membrane installed correctly

  • Tiles Correctly installed with clips/nails

  • Pipe Soakers correctly installed

  • Lead Soakers correctly installed

  • Name and Signature of person carrying out the inspection

  • Is the area being handed over

  • Name of area

  • Photo of area

  • Signature of client

House Keeping

  • What area/areas have been cleared of waste and materials?

  • All materials have been put back in the correct storage areas?

  • All COSHH has been put back in the correct storage area?

  • All Waste has been disposed of in the correct skips?

  • All Corridors, doorways and communal areas are free from obstruction?

  • All loose and lightweight materials have been tied off and secured on roofs and outdoor areas?

  • Name of person carrying out the checks?

  • Signatue

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.