Title Page

  • Site conducted

  • Site Address
  • Report By

  • Date

Transport & Lifting

  • Transport - All components were correctly loaded and fastened as per transportation document, report any damage.

  • Photographs Required

  • Photographs Required

  • All components weights specified on nameplates are correct as per freight layout/craning & excavation document

  • Has crane operator been advised of the changes to component weights

  • Is a spreader bar being used for lifting of components

  • Photographs required

  • Have you notified the Construction Manager for approval to proceed prior to commencing any lifts

  • Site instruction , approval form (document # HS-Site-006) has been signed by Client

  • Crane lifts commenced

Pump Station Components

  • All components have been checked for cracking. Is there any evidence of cracking.

  • Photographs required

  • Details:

  • Epoxy coating has been applied correctly to all surfaces as per IFC Civil/Mechanical drawings. The application is free from pin<br>holes and air bubbles etc.

  • Photographs required

  • Photographs Required

  • Details

  • HDPE liner installed as specified on the IFC Civil/Mechanical drawings.

  • HDPE liner is not damaged and is free from any air bubbles, sctaches or tears

  • Photographs Required

  • Photographs Required

  • Details

  • Increment Core Hole & Conduits – Positions and dimensions identified, inlets and rising mains as per <br>drawings supplied

  • Photographs required

  • Photographs Required

  • Details

  • Inlet Stub – Check installation matches drawing, bolt holes, level etc.

  • Photographs required

  • Photographs Required

  • Details

  • Has Knivegate Valve been fitted to inlet pipe prior to lowering segment into the ground

  • Has knive gate been fully closed

  • Photographs required

  • Have bolts been torqued

  • Photographs required of witness markings

  • Has a blind flange or plug been fitted to inlet stub to prevent flooding of pump station

  • Photograph required

  • Cover Slab checked and there are no evident cracks. Surface finish is of acceptable standard

  • Photograph required

  • Photographs Required

  • Deatils

  • Cover Slab – Check lid orientation alignment is correct and all lids are easily opened

  • Photo Required

  • Photographs Required

  • Details

  • Cover Slab – Locking mechanisms are correctly aligned and padlocks can be easily applied

  • Photo Required

  • Photographs Required

  • Details

  • Cover Slab – Lid sealing strips have been correctly installed

  • Photo Required

  • Photographs Required

  • Details

  • Cover Slab – Check I/O spindle orientation is correct.

  • Photograph required

  • Photographs Required

  • Details

  • Cover Slab – Check conduit entry mains power core hole position.

  • Photograph required

  • Cover Slab – Check positions of educt vent / vent core hole / bolt patterns.

  • Photograph required

Valve Pit Components

  • Is there a separate valve pit to be installed?

  • All components have been checked for cracking. Is there any evidence of cracking.

  • Photo Required

  • Photographs Required

  • Epoxy coating has been applied correctly to all surfaces as per IFC Civil/Mechanical drawings. The application is free from pin<br>holes and air bubbles etc.

  • Photo Required

  • Photographs Required

  • Details

  • Core Hole & Conduits – Positions and dimensions identified as being correct with drawing supplied

  • Photograph required

  • Photographs Required

  • Deatils

  • Cover Slab checked and there are no evident cracks. Surface finish is of acceptable standard

  • Photograph required

  • Photographs Required

  • Details

  • Cover Slab – Check lid orientation alignment is correct and all lids are easily opened

  • Photograph required

  • Photographs Required

  • Details

  • Cover Slab – Locking mechanisms are correctly aligned and padlocks can be easily applied

  • Photograph required

  • Photographs Required

  • Details

  • Cover Slab – Lid sealing strips have been correctly installed

  • Photograph required

  • Photographs Required

  • Details

Flow Meter Pit Components

  • Is there a flow meter pit to be installed?

  • All components have been checked for cracking. There is no evidence of cracking.

  • Photograph required

  • Details

  • Epoxy coating has been applied correctly to all surfaces as per IFC Civil/Mechanical drawings. The application is free from pin<br>holes and air bubbles etc.

  • Photograph required

  • Photographs Required

  • Details

  • Core Hole & Conduits – Positions and dimensions identified as being correct with drawing supplied

  • Photograph required

  • Photographs Required

  • Details

  • Cover Slab checked and there are no evident cracks. Surface finish is of acceptable standard

  • Photograph required

  • Photographs Required

  • Details

  • Cover Slab – Check lid orientation alignment is correct.

  • Photo Required

  • Photographs Required

  • Details

Civil Installation

  • Excavation – for pump station correctly prepared in accordance with IFC Civil/Mechanical drawings backfill requirements<br>, Craning and excavation document.

  • Photograph required

  • Photograph required

  • Details:

  • Excavation Base – compacted and finished to RL depth in accordance with IFC Civil/Mechanical drawings backfill requirements<br>, Craning and excavation document. Check with civil contractor

  • Photograph required

  • Photographs required

  • Details

  • Base Unit – Installed with orientation to suit gravity inlet-sewer and rising main

  • Photograph required

  • Photograph required

  • Details:

  • Base unit installation procedure – adhered to by Civil Contractor in accordance with specifications,and is level

  • Photograph required

  • Photograph required

  • Details:

  • Base Unit diameter

  • Top and the 45 degree rebates have been sprayed with aerosol primer prior to applying mastic

  • Photograph required

  • Base Component - 2 runs to top rebate and 1 run to 45 degree rebate of mastic has been applied

  • Photograph required

  • Underneath side of all increments being placed is free from dirt , mud etc. and has been sprayed with aerosol primer

  • Photograph required

  • Top of all increments being placed is free from dirt , mud etc. and has been sprayed with aerosol primer

  • Photograph required

  • Increments - 2 runs to top rebate and 1 run to 45 degree rebate of mastic has been applied

  • Photograph required

  • Increments – Installed correctly as per IFC Civil/Mechanical drawings (with civil contractor) ensure level before installing<br>next increment

  • Photograph required

  • Top of last increment/intergal valve chamber being placed is free from dirt , mud etc. and has been sprayed with aerosol primer

  • Photograph required

  • 3 runs of mastic has been applied to top face of last increment/intergal valve chamber

  • Photograph required

  • Underneath side of coverslab being placed is free from dirt , mud etc. and has been sprayed with aerosol primer

  • Photograph required

  • Coverslab has been placed minium of 10mm proud of internal walls to ensure pump claw does not clash

  • Photograph required

  • Top & 45 degree rebates has been sprayed with aerosol primer prior to applying mastic

  • Photograph required

  • Base Component - 2 runs to top rebate and 1 run to 45 degree rebate of mastic has been applied

  • Photograph required

  • Underneath side of all increments being placed is free from dirt , mud etc. and has been sprayed with aerosol primer

  • Photograph required

  • Top of all increments being placed is free from dirt , mud etc. and has been sprayed with aerosol primer

  • Photograph required

  • Increments - 1run to top rebate and 1 run to 45 degree rebate of mastic has been applied

  • Photograph required

  • Increments – Installed correctly as per IFC Civil/Mechanical drawings (with civil contractor) ensure level before installing<br>next increment

  • Photograph required

  • Top of last increment/intergal valve chamber being placed is free from dirt , mud etc. and has been sprayed with aerosol primer

  • Photograph required

  • 3 runs of mastic has been applied to top face of last increment/intergal valve chamber

  • Photograph required

  • Underneath side of coverslab being placed is free from dirt , mud etc. and has been sprayed with aerosol primer

  • Photograph required

  • Coverslab has been placed minium of 10mm proud of internal walls to ensure pump claw does not clash

  • Photograph required

  • Top & 45 degree rebates has been sprayed with aerosol primer prior to applying mastic

  • Photograph required

  • Base Component - 1 run to top rebate and 1 run to 45 degree rebate of mastic has been applied

  • Photograph required

  • Underneath side of all increments being placed is free from dirt , mud etc. and has been sprayed with aerosol primer

  • Photograph required

  • Top of all increments being placed is free from dirt , mud etc. and has been sprayed with aerosol primer

  • Photograph required

  • Increments - 1 run to top rebate and 1 run to 45 degree rebate of mastic has been applied

  • Photograph required

  • Increments – Installed correctly as per IFC Civil/Mechanical drawings (with civil contractor) ensure level before installing<br>next increment

  • Photograph required

  • Top of last increment/intergal valve chamber being placed is free from dirt , mud etc. and has been sprayed with aerosol primer

  • Photograph required

  • 3 runs of mastic has been applied to top face of last increment/intergal valve chamber

  • Photograph required

  • Underneath side of coverslab being placed is free from dirt , mud etc. and has been sprayed with aerosol primer

  • Photograph required

  • Coverslab has been placed minium of 10mm proud of internal walls to ensure pump claw does not clash

  • Photograph required

  • Is gator wrapping of increments joins required ? Check IFC Civil /Mechanical drawings for requirements

  • How many joints have been Gator wrapped

  • Gator Wrap - Ensure surfaces are clean - free from debri and Aerosol primer has been applied

  • Photograph required

  • Gator wrap has been placed as per manufacturers instructions.

  • Photograph required

  • Megapoxy has been applied to all below ground lifting lugs

  • Photographs required

  • Is a separate valve pit being installed

  • Excavation – Correctly prepared in accordance with IFC Civil/Mechanical drawings backfill requirements<br>, Craning and excavation document.

  • Photograph required

  • Photographs Required

  • Details

  • Excavation Base – compacted and finished to RL depth in accordance with IFC Civil/Mechanical drawings backfill requirements<br>, Craning and excavation document. Check with civil contractor

  • Photograph required

  • Photographs Required

  • Details

  • Top of valve pit being placed is free from dirt , mud etc. and has been sprayed with aerosol primer

  • Photograph required

  • 2 runs of mastic applied to top of valve pit

  • Photograph required

  • Coverslab placed as per IFC Civil/Mechanical drawings and is correctly aligned with pump station coverslab

  • Photograph required

  • Photographs Required

  • Details

  • Megapoxy has been applied to all below ground lifting lugs

  • Photographs required

  • Is a flow meter pit being installed

  • Excavation – Correctly prepared in accordance with IFC Civil/Mechanical drawings backfill requirements<br>, Craning and excavation document.

  • Photograph required

  • Photographs Required

  • Details

  • Excavation Base – compacted and finished to RL depth in accordance with IFC Civil/Mechanical drawings backfill requirements<br>, Craning and excavation document. Check with civil contractor

  • Photograph required

  • Photograph Required

  • Details

  • Top of valve pit being placed is free from dirt , mud etc. and has been sprayed with aerosol primer

  • Photograph required

  • 2 runs of mastic applied to top of flow meter pit

  • Photograph required

  • Coverslab placed as per IFC Civil/Mechanical drawings and is correctly aligned with pump station /valve pit coverslabs

  • Photograph required

  • Photographs Required

  • Details

  • Megapoxy has been applied to all below ground lifting lugs

  • Photographs Required

  • All access lids have been locked with Aquatec padlocks

  • Photographs Required

Signatures

  • Add all additional photos here:

  • Have the drawings been red pen marked up ?

  • Notes/Comments:

  • Aquatec Representative:

  • Signature:

  • Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.