Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Drill Pattern
-
DRILL PATTERN PREP: Are drill areas signed off as per site requirement, with adequate floor condition and clearance for drill design?
-
Are all drill patterns properly delineated as per site procedure?
-
Is there excessive dust in the work area?
-
Drill pattern has a designated parking area off the pattern.
-
Is work taking place in a high risk zone. i.e.: undulated ground conditions
-
Have pre-start check’s been completed on all equipment being used?
-
Is high wall in an adequately safe condition - Rock fall areas identified and controls in place.
-
Have lighting plant been setup for upcoming nightshift?
-
Access tracks are compliant for SME, HV's & LV's
-
Drill consumables stored & handled correctly while in use.
Blast Pattern
-
Are all windrows of adequate height?
-
Are all blast patterns properly delineated / Blue lights present for sleeping shots?
-
All personnel competent to perform task they are assigned?
-
Blast crew have SIGNED OFF load sheets before loading commences.
-
Has the blast pattern been dipped and logged for depth before loading commences?
-
Have blast board notifications been completed before shift and are they correct?
-
Is there a delineated parking area being used for explosives vehicles in use?
-
Have clear instructions given to the explosive truck operator and safe access to blast pattern made available?
-
Have pre-start checks been completed on all equipment being used?
-
Authorised Shotfirer is present when loading / explosives are handled?
-
Stemming pile is suitably located, to specification and contamination free.
-
Access tracks are compliant for MPU & Stemming IT.
-
Have Blast Guards been allocated and issued with a clearance map?
General Safety
-
All Personnel conducted BAC testing prior to shift.
-
Has every person been properly trained to do the job they are doing?
-
Is PPE being worn as prescribed?
-
For non routine work with NO Procedure, has a THA / JHA been completed?
-
Are all Witnessed isolations completed according to procedure?
-
Are all work groups on site aware of Blasting time?
-
Working above and below controls are in place (if required).
-
Are there any adverse weather conditions?
Laydown/Maintenance Yard
-
Fire Extinguishers accessible?
-
Housekeeping adequate?
-
Rubbish bins emptied
-
All Parking bays compliant with site standard.
-
Work conducted in the yard has adequate delineation and signage in place?
-
All Bulk liquids in appropriate Bunding?
-
Electrical equipment in use tags are compliant?
-
Lifting equipment in use, are tags compliant?
-
SME - HV & LV's parked in designated parking areas.
Sign Off
-
Supervisor Conducting Inspection