Information
-
Site conducted
-
Name of Area Supervisor Inspecting
-
Time and Date of Inspection
Inspection Focus Area
-
Notify OCE of intended inspection via two-way radio:
-
What two-way channel was used?
-
OCE Name?
-
Action Taken or Controls Implemented?
-
Why?
-
Inspected by a Work Area Supervisor in a light vehicle? (Please add note if different from supervisor completing)
- Yes
- No
-
(Please add note if different from supervisor completing this checklist)
-
Department
- BMA Prestrip
- OS Prestrip
- BMA Coal
- Service Bay
-
Crew
-
Ramp
- R2
- R4
- R8
- R9
- R10
- R11
- R12
- R13
- R14
- R15
- R16
- R53
- R57
-
Loading Unit
- SHE37
- SHE38
- EXD96
- EXD94
- EXD79
- Other
-
Dump Location
Access Inspection
-
Haul roads are adequate for haul trucks or other rubber tyred equipment to allow sufficient braking and steering?
-
Access to the main haul road from the circuit. e.g. corridor road trafficable and have the required additional restricted access signage?
-
Access to the workshop or tyre bay from the circuit is trafficable?
-
Are any access roads connecting the current circuit to another active circuit/work area trafficable for haul trucks or other rubber tyred equipment?
-
Please detail which ones have been inspected and are trafficable. (E.g. Current circuit being inspected to workshop open and open roads)
-
Has IROC+ been given notice via radio prior to recommencing operation and informed which connector roads are trafficable, which are restricted AND which are closed for haul trucks & rubber tyred equipment?
-
What two-way channel was used?
-
Controllers Name?
-
Haul roads are correct widths, ensuring no mud or grader rills are reducing the road width to below the site standard. e.g. 3.5 x largest <br>vehicle width (e.g. 797s = 36m dual lane). Refer SRM STD Design and Construction of Mine Roads.
-
What are the restrictions and what controls are in place?
-
All intersections and access points to circuit have correct signage and visibility to begin operations. Refer SRM STD Design and Construction of Mine Roads
-
What controls are in place?
-
Are all haul roads free from water erosion/damage at time of inspection?
-
what Controls are in place?
-
Are all accesses and haul roads free from undermining of edges at time of inspection?
-
Is bridge crossing free from water erosion/damage at time of inspections?
-
Bridges have been inspected from vantage points on both sides for undermining?
-
Confirmed the pit floor is free of water erosion/damage at time of inspection?
-
Crew
-
Ramp
- R2
- R4
- R8
- R9
- R10
- R11
- R12
- R13
- R14
- R15
- R16
- R53
- R57
-
Loading Unit
- EXD75
- EXD91
- EXD92
- EXD93
- EXD310
- Other
-
Dump Location
Access Inspection
-
Haul roads are adequate for haul trucks or other rubber tyred equipment to allow sufficient braking and steering?
-
Access to the main haul road from the circuit. e.g. corridor road trafficable and have the required additional restricted access signage?
-
Access to the workshop or tyre bay from the circuit is trafficable?
-
Are any access roads connecting the current circuit to another active circuit/work area trafficable for haul trucks or other rubber tyred equipment?
-
Please detail which ones have been inspected and are trafficable. (E.g. Current circuit being inspected to workshop open and open roads)
-
Has IROC+ been given notice via radio prior to recommencing operation and informed which connector roads are trafficable, which are restricted AND which are closed for haul trucks & rubber tyred equipment?
-
What two-way channel was used?
-
Controllers Name?
-
Haul roads are correct widths, ensuring no mud or grader rills are reducing the road width to below the site standard. e.g. 3.5 x largest <br>vehicle width (e.g. 797s = 36m dual lane). Refer SRM STD Design and Construction of Mine Roads.
-
What are the restrictions and what controls are in place?
-
All intersections and access points to circuit have correct signage and visibility to begin operations. Refer SRM STD Design and Construction of Mine Roads
-
What controls are in place?
-
Are all haul roads free from water erosion/damage at time of inspection?
-
what Controls are in place?
-
Are all accesses and haul roads free from undermining of edges at time of inspection?
-
Is bridge crossing free from water erosion/damage at time of inspections?
-
Bridges have been inspected from vantage points on both sides for undermining?
-
Confirmed the pit floor is free of water erosion/damage at time of inspection?
-
Crew
-
Work Area
- Ramp
- ROM ONLY
- Other Work Area
-
Loading Unit
- LDW273
- LDW290
- LDW292
- Other
-
Dump Location
Access Inspection
-
Haul roads are adequate for haul trucks or other rubber tyred equipment to allow sufficient braking and steering?
-
Access to the workshop or tyre bay from the ROM is trafficable?
-
Are any access roads connecting to the ROM trafficable for haul trucks or other rubber tyred equipment?
-
Please detail which ones have been inspected and are trafficable. (E.g. Current circuit being inspected to workshop open and open roads)
-
Has IROC+ been given notice via radio prior to recommencing operation and informed which connector roads are trafficable, which are restricted AND which are closed for haul trucks & rubber tyred equipment?
-
What two-way channel was used?
-
Controllers Name?
-
All intersections and access points to ROM have correct signage and visibility to begin operations. Refer SRM STD Design and Construction of Mine Roads
-
What controls are in place?
-
Are all haul roads free from water erosion/damage at time of inspection?
-
what Controls are in place?
-
Are all accesses and haul roads free from undermining of edges at time of inspection?
-
Loading Unit
- EXD078
- EXD095
- LDW273
- LDW290
- LDW292
- EXD079
- Other
-
Dump Location
Access Inspection
-
Haul roads are adequate for haul trucks or other rubber tyred equipment to allow sufficient braking and steering?
-
Access to the workshop or tyre bay from the circuit is trafficable?
-
Are any access roads connecting the current circuit to another active circuit/work area trafficable for haul trucks or other rubber tyred equipment?
-
Please detail which ones have been inspected and are trafficable. (E.g. Current circuit being inspected to workshop open and open roads)
-
Has IROC+ been given notice via radio prior to recommencing operation and informed which connector roads are trafficable, which are restricted AND which are closed for haul trucks & rubber tyred equipment?
-
What two-way channel was used?
-
Controllers Name?
-
Haul roads are correct widths, ensuring no mud or grader rills are reducing the road width to below the site standard. e.g. 3.5 x largest <br>vehicle width (e.g. 797s = 36m dual lane). Refer SRM STD Design and Construction of Mine Roads.
-
What are the restrictions and what controls are in place?
-
Are all haul roads free from water erosion/damage at time of inspection?
-
what Controls are in place?
-
Are all accesses and haul roads free from undermining of edges at time of inspection?
-
Is bridge crossing free from water erosion/damage at time of inspections?
-
Bridges have been inspected from vantage points on both sides for undermining?
-
Confirmed the pit floor is free of water erosion/damage at time of inspection?
-
What controls are in place?
-
Loading Unit
- EXD078
- EXD095
- LDW273
- LDW290
- LDW292
- EXD079
- Other
-
Dump Location
Access Inspection
-
Haul roads are adequate for haul trucks or other rubber tyred equipment to allow sufficient braking and steering?
-
Access to the workshop or tyre bay from the circuit is trafficable?
-
Are any access roads connecting the current circuit to another active circuit/work area trafficable for haul trucks or other rubber tyred equipment?
-
Please detail which ones have been inspected and are trafficable. (E.g. Current circuit being inspected to workshop open and open roads)
-
Has IROC+ been given notice via radio prior to recommencing operation and informed which connector roads are trafficable, which are restricted AND which are closed for haul trucks & rubber tyred equipment?
-
What two-way channel was used?
-
Controllers Name?
-
Haul roads are correct widths, ensuring no mud or grader rills are reducing the road width to below the site standard. e.g. 3.5 x largest <br>vehicle width (e.g. 797s = 36m dual lane). Refer SRM STD Design and Construction of Mine Roads.
-
What are the restrictions and what controls are in place?
-
All intersections and access points to circuit have correct signage and visibility to begin operations. Refer SRM STD Design and Construction of Mine Roads
-
What controls are in place?
-
Are all haul roads free from water erosion/damage at time of inspection?
-
what Controls are in place?
-
Are all accesses and haul roads free from undermining of edges at time of inspection?
-
Is bridge crossing free from water erosion/damage at time of inspections?
-
Bridges have been inspected from vantage points on both sides for undermining?
-
Confirmed the pit floor is free of water erosion/damage at time of inspection?
-
What controls are in place?
-
Crew
-
Service Truck
- ST7
- ST60
- ST61
- ST64
- ST65
- Other
-
Please list which Work area/location the ST is expected to travel? (e.g from R9 Inpit S/Bay to industrial area S/Bay or Industrial Area S/Bay to EXD96)
Access Inspection
-
Haul roads are adequate for haul trucks or other rubber tyred equipment to allow sufficient braking and steering?
-
Access to the workshop or tyre bay from the Service Bay is trafficable?
-
Haul roads are correct widths, ensuring no mud or grader rills are reducing the road width to below the site standard. e.g. 3.5 x largest <br>vehicle width (e.g. 797s = 36m dual lane). Refer SRM STD Design and Construction of Mine Roads.
-
What are the restrictions and what controls are in place?
-
Are all haul roads free from water erosion/damage at time of inspection?
-
What controls are in place?
-
Are all accesses and haul roads free from undermining of edges at time of inspection?
-
What controls are in place?
-
Is bridge crossing free from water erosion/damage at time of inspections?
-
What controls are in place?
-
Bridges have been inspected from vantage points on both sides for undermining?
Checklist
Continuing Operations or Before Commencing Following Wet Weather Event
-
Are all required roads adequate to enable safe operation?
-
What controls are in place if not already listed above?
-
Notify OCE commencing of work and mobilization of rubber tyred equipment (haul trucks, service trucks and water carts).
-
What two-way channel was used?
-
OCE Name?
-
What time was the OCE contacted?
-
Action Taken or Controls Implemented?
-
Why?
Additional Comments
-
General Comments
Sign Off
-
Please list time and date.
-
Work Area Supervisor