Sola Deck & Quick Flash:
-
Sola Deck Box/Boxes installed as per Layout provided by SSEG?
-
Quick Flash/Smurf Tub installed prior to Lath
Solar Rough Electric Installation
-
Wire size as per plan and applicable codes?
-
Bores through studs and Top plates are as close to the center as possible ?
-
Nail plates are installed in all required location as per all applicable codes ?
-
Wiring secured within 6" of all Electrical boxes without clamps and 12" of all Electrical boxes with Clamps?
-
All wiring secured every 4" throughout home without crimping wire in a Craftsman manner?
-
All wiring run along Joists and or Trusses are to be ran perpendicular (Not Diagonal) in a Craftsman manner?
-
-
All wiring in Attic space runs along Bottom Chord of Trusses Except to make final ruse to roof sheeting,<br>I which it runs along the Truss webbing to the roof sheeting in a Craftsman manner?
-
All wiring running to roof sheeting in attic is to be landed in the Sola Deck Box/Boxes?
-
Electrical/Low Volt Boxes at Envoy location are to be mounted approximately 6" from floor and side by side in the same stud bay?
-
Low Voltage (Cat 5) landed in media Box?
-
All Debris removed from Homesite and disposed of in the proper receptacle?
-
Home site ready for inspection?
-
Installation notes: