Title Page

  • Document No.

  • Division

  • Community Lot Phase QC Address

  • Conducted on

  • Prepared by

  • Personnel

Sola Deck & Quick Flash:

  • Sola Deck Box/Boxes installed as per Layout provided by SSEG?

  • Quick Flash/Smurf Tub installed prior to Lath

Solar Rough Electric Installation

  • Wire size as per plan and applicable codes?

  • Bores through studs and Top plates are as close to the center as possible ?

  • Nail plates are installed in all required location as per all applicable codes ?

  • Wiring secured within 6" of all Electrical boxes without clamps and 12" of all Electrical boxes with Clamps?

  • All wiring secured every 4" throughout home without crimping wire in a Craftsman manner?

  • All wiring run along Joists and or Trusses are to be ran perpendicular (Not Diagonal) in a Craftsman manner?

  • All wiring in Attic space runs along Bottom Chord of Trusses Except to make final ruse to roof sheeting,<br>I which it runs along the Truss webbing to the roof sheeting in a Craftsman manner?

  • All wiring running to roof sheeting in attic is to be landed in the Sola Deck Box/Boxes?

  • Electrical/Low Volt Boxes at Envoy location are to be mounted approximately 6" from floor and side by side in the same stud bay?

  • Low Voltage (Cat 5) landed in media Box?

  • All Debris removed from Homesite and disposed of in the proper receptacle?

  • Home site ready for inspection?

  • Rate overall installation:

  • Installation notes:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.