Title Page

  • SSL Site

  • Contractor

  • Conducted on

  • Prepared by

Check list

  • Have engineers signed in / out ?

  • Have engineer got correct PPE ?

R2 Condenser / Gas Cooler Maintenance

  • Have you cleaned the condenser / gas coolers as per the SOP ? ( please attach before and after photos ).

  • Are all fans operational ?

  • Is there adequate lighting?

R1- Pack Maintenance

  • Are all liquid levels satisfactory?

  • Is the plant room clean and tidy, please add photos.

  • Are all oil levels satisfactory?

  • All all packs clean and tidy?

  • Are all compressors operational?

Comments

  • Outstanding issues

Engineers Name & Signature

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.