Title Page
-
SSL Site
-
Contractor
-
Conducted on
-
Prepared by
Check list
-
Have engineers signed in / out ?
-
Have engineer got correct PPE ?
R2 Condenser / Gas Cooler Maintenance
-
Have you cleaned the condenser / gas coolers as per the SOP ? ( please attach before and after photos ).
-
Are all fans operational ?
-
Is there adequate lighting?
R1- Pack Maintenance
-
Are all liquid levels satisfactory?
-
Is the plant room clean and tidy, please add photos.
-
Are all oil levels satisfactory?
-
All all packs clean and tidy?
-
Are all compressors operational?
Comments
-
Outstanding issues
Engineers Name & Signature
-
Add signature