1. SITE CONTROL

  • Clear & Defined Entry To Site From Road / RoW

  • Traffic Management Plan In Place

  • Site Boundaries Secure

  • Entry Hazard Board & Signage At Site Entry

  • Site Office Clearly Identified & Safe Access Indicated Prior To Site Entry

  • Hazard Board & Signage Dated

  • Hazard Board & Signage With POC Details

  • SSSP Onsite & Complete

  • Site Visitor Log Available & Completed

  • All Trade SWMS On Site

  • Safety Notice Board At Site Sign In

  • Safety Inductions Complete For All On Site

  • Safety Notice Board Current

  • Site Safe Passport Or Similar Required For Site

  • Toolbox Safety Meetings Up To Date

  • Environmental Plans / Requirements Current

2. SITE FACILITIES

  • Offices - Clean, Adequate & With Good Lighting

  • Break Sheds - Clean, Adequate, & With Potable Water

  • Tool Sheds - Clean, Adequate & Secure

  • Toilets - Clean, Adequate, & With Washing Water

  • Smoking Area Off Site Identified

3. GENERAL SITE TIDINESS & ACCESSWAYS

  • Clear, Safe Access To Work Areas

  • Stairways & Access-ways Clear

  • Hoardings / Fence & Gates Secure

  • Loose Materials Secure From Wind

  • Construction Waste Materials Stored Safely Or In Waste Bins For Removal

4. PERSONAL SAFETY EQUIPMENT (PPE)

  • PPE Assessment Completed

  • PPE Signage Displayed & Legible

  • Hardhats Being Worn

  • Correct Footwear Being Worn

  • Hi-Viz Vests / Clothing Being Worn

  • Eye Protection Being Used

  • Hearing Protection Being Used

  • Masks / Respirators Being Used

  • Seasonal Clothing Considered

  • Harness Inspections Completed And Current Certification

  • Height & Harness Certified Operators

5. FIRST AID / FIRE PREVENTION / EVACUATION

  • First Aid Assessment Completed

  • First Aid Equipment Available

  • Injury Register / Investigation Processes In Place

  • Fire Fighting Equipment Available

  • Fire Extinguisher Type & Number Sufficient

  • Fire Extinguisher Service Certificate <12 Months

  • Evacuation Plan In Place

  • All Emergencies Included

  • Primary Assembly Area Identified & Sign Posted

  • Evacuation Trial Completed <12 Months

  • Secondary Assembly Area Identified & Sign Posted

6. CRANES / HOISTS / LIFTING EQUIPMENT

  • Crane / Lift Assessment Plan Completed

  • Crane Certification Current

  • Man Cage Certified

  • Slings / Chains / Hooks Certified

  • Licensed / Authorised / Competent User Checks Completed

  • Operator Procedures In Place

  • Inspections Completed

  • Emergency Plan In Place

  • Rescue Plan In Place

  • WorkSafe NZ Notifiable Work Notifications Completed For Crane / Lift

  • MEWP Certified With Current WoF

  • MEWP Safety Checks Completed

  • MEWP Anchor Point Certified And Labelled

  • WorkSafe NZ Notifiable Work Notifications Completed Fore MEWP Over 5m Access

7. COMPRESSED AIR EQUIPMENT

  • In Good Condition

  • Appropriate Guards Fitted

  • Trained User

8. EXCAVATIONS

  • Open Excavations Correctly Shored

  • Fall Risks Assessed & Controlled

  • Excavation Machinery / Equipment Procedures In Place

  • Licensed / Authorised / Competent User Checks Completed

  • WorkSafe NZ Notifiable Work Notifications Completed

9. WELDING / GAS CUTTING

  • Hot Work Permits Issued

  • Fire Extinguishers On Hand

  • Operators Using PPE

  • Licensed / Authorised / Competent User Checks Completed

  • WorkSafe NZ Notifiable Work Notifications Completed

10. ELECTRICAL EQUIPMENT

  • Main Board Lockable / Weatherproof

  • Current Tagged Plant

  • Current Tagged Lifeguards

  • Current Tagged & Damage-free Leads

  • Leads Safely Placed

  • Equipment In Good Condition

  • Appropriate Guards On Equipment

  • Adequate Temporary Lighting

  • Contractors Equipment Checked Safe With Current Tag

11. CHEMICALS

  • Correctly Stored

  • Safety Data Sheets Available

  • Operators Using Required PPE

  • Warning Signage Adequate

12. TOOLS

  • Powder Actuated Tools Securely Stored

  • Powder Actuated Tools WoF Current

  • Operator Procedures In Place

  • Powder Actuated Tools Signage On Site

  • Licensed / Authorised / Competent User Checks Completed

13. SCAFFOLDING

  • Licensed / Authorised / Competent Installer Checks Completed

  • Installation Follows CoP / Good Practice Guidelines

  • Installer Procedures In Place

  • Notifiable Weekly Scaftags / Certificates Current

  • WorkSafe NZ Notifiable Work Notifications Completed

  • Base Sound

  • Ladders / Stairs Installed

  • Handrails / Mid-rails Installed

  • Toe Boards Installed

  • Platforms Fixed

  • Planks Tied Down

  • Headroom Clear

  • Work Platforms Clear

  • Ties / Bracing Adequate

  • Screening Installed

14. LADDERS

  • Trade Rated

  • Maximum Load Posted

  • Test Certificate Current

  • Working 2 Steps Down

  • Three Points Of Contact

  • Secured Top & Bottom

15. FALL HAZARDS

  • Floor Edges / Floor Openings Protected

  • Lift Shaft Openings Protected

  • Void Fall Areas Protected

  • Adequate Fall Restraint Systems In Use

  • Anchor Points Identified For Fall Restraint

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.