Title Page
-
Conducted on
-
Job Number
-
Prepared by
-
Line
-
Supplied Drawings
Chassis, 1st fix plumbing and deck.
-
Centre lugs equal over both halves.
-
Pressure Test. Pre Decking
-
Evidence
-
Pressure Test. Deck Down.
-
Evidence
-
Radiator Pipework As Spec. Location And Size
-
Evidence
-
Pipework Defined Hot+Cold
-
Evidence
-
Open Ends Of Pipework Sealed
-
Evidence
-
Flow And Return Defined
-
Evidence
-
Condition of fixing points. Timber and Fixings.
-
Evidence
-
Coach Bolts Secure To Chassis
-
Evidence
-
Insect mesh fitted under home if specified
-
Insect mesh installation/Damages
-
Evidence