Title Page

  • Conducted on

  • Job Number

  • Prepared by

  • Line

  • Supplied Drawings

Chassis, 1st fix plumbing and deck.

  • Centre lugs equal over both halves.

  • Pressure Test. Pre Decking

  • Evidence

  • Pressure Test. Deck Down.

  • Evidence

  • Radiator Pipework As Spec. Location And Size

  • Evidence

  • Pipework Defined Hot+Cold

  • Evidence

  • Open Ends Of Pipework Sealed

  • Evidence

  • Flow And Return Defined

  • Evidence

  • Condition of fixing points. Timber and Fixings.

  • Evidence

  • Coach Bolts Secure To Chassis

  • Evidence

  • Insect mesh fitted under home if specified

  • Insect mesh installation/Damages

  • Evidence

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.