Title Page
-
Survey Reference
-
PON Reference Number
-
Installation Building Name
-
Installation Address
-
Installation Post Code
-
Conducted on
-
Prepared by
Onsite Details
-
Onsite Contact Name
-
Onsite Contact Telephone Number(s)
-
Onsite Contact Email Address
-
Is the building Pre 2000?
-
Is there an Asbestos Register onsite?
-
What is the size of the MDU?
-
Where are we proposing to locate the CBT/Splitter/BUDI Box?
External Survey Details
-
How are we proposing to feed the premise?
-
How many OH spans from the first pole to the premise are there?
-
Is the first pole a DP or CP?
-
Have you tested all the poles?
-
Are any of the poles defective or not useable?
-
Are any of the poles on Private Land?
-
Will Traffic Management be required?
-
Provide any additional information
-
Photo Gallery
-
Is the civils work on Private Land, Public Land or Both?
-
How many Metres of duct 54mm in Soft is required?
-
How many Metres of duct 54mm in Footway is required?
-
How many Metres of duct 54mm in Carriageway is required?
-
How many Metres of duct 96mm in Soft is required?
-
How many Metres of duct 96mm in Footway is required?
-
How many Metres of duct 96mm in Carriageway is required?
-
Are any chambers required?
-
Will Traffic Management be required?
-
Provide any additional information
-
Photo Gallery
-
Has the Openreach Lead-In been Test Rodded?
-
Has the Openreach Lead-In been Roped?
-
Are there any blockages in the Lead-In?
-
Has an A55 been raised?
-
Has any other part of the Openreach Network been Test Rodded?
-
Has any other part of the Openreach Network been Roped?
-
Will Traffic Management be required?
-
Provide any additional information
-
Photo Gallery
Internal Survey
-
Has an Internal Survey been carried out?
-
Is there a dedicated Comms Room?
-
How many floors are there?
-
How many Apartments are there on each floor?
-
Are there any Riser Cupboards or Risers?
-
Are there any External holes that need to be drilled?
-
Are there any Internal holes that need to be drilled?
-
What size of internal fibre cable(s) will be required?
-
How many Metres of cable will be required?
-
Will Tray and Trunking be required?
-
Provide additional information that will be useful to the Internal installation
-
Please supply all un-annotated photos here