Title Page
-
Audit Title
Location of pour
-
Inspection by
- Mark Frame
- Clifford Long
-
Location of pour
-
Photo of area
-
Weather
- Fine
- overcast
- light rain
- heavy rain
- light wind
- medium wind
- strong wind
-
Inspection checked engineer
Form work
-
Dimensions checked/confirmed
-
Supports checked
-
Access included safe access to area to pour
-
Stop ends /column joints
-
Beam or column pour heights marked
-
Dividags/ bolts/ propping check
-
Shutter sealing tape installed
-
Check for cleanliness -no off cuts or rubbish in pour area
-
Proving pre cast units as per shop drawings
-
Comments
-
Photos of inspection
Sign off
-
Clear to proceed signatures
Harris Dowd, NRL, any service trade,
Signature
-
Name and sign
Reinforcing
-
Spacing checked
-
Bar types checked as per drawing/detail sheet
-
Cover checked 50mm min
-
Inserts checked as per drawing
-
Laps / splice to requirements
-
Starter bars
-
Checked for cleanliness -no tie wire or off cuts
-
Comments
-
Photos of inspection
Sign off
-
Clear to proceed signatures
Harris Dowd, NRL & any service trade,
Signature
-
Name and sign
Miscellaneous
-
Facade cast in items checked
-
Other cast in items
-
Penetrations checked
-
Rebates checked
-
Retarder or super in mix
-
Services sign off conduits or ducting
-
Comments
-
Photos of inspection
Sign off
-
Clear to proceed signatures
Harris Dowd, NRL & Mohan waterproofing, any service trade,
Signature
-
Name and sign
Concrete dockets
-
Photos of dockets