Post work checklist
-
Site Name/Address:
-
frequency
- Monthly
- 2 Monthly
- 3 Monthly
- 4 Monthly
- 6 monthly
- yearly
- one off
-
Work Order No(s):
-
Haz Work Permit signed to start?
-
Wind speed (MPH):
-
Have you read and understood the risk assessment and method statement for this task?
-
Is the staff tags in date?
-
Is the 6 monthly thorough examinations for the rope equipment in date?
-
Does the anchor points have a valid, in date 6 Monthly Thorough examination certificate?
-
Do you have the equipment as specified in the in the RAMS?
-
Have all team members completed the pre-use harness inspection?
-
Are all staff wearing the right PPE as set out the the RAMS?
-
As a safe working zone been setup using cones and batons and signs erected below and around the area of work?
-
Has the correct preparations been made for the rescue plan to be implemented if needed?
-
Are all opertives using the correct edge and rope protection?
Sign Off
-
Auditor's signature