Title Page

  • Site Name

  • BUN Code / Site ID

  • Parking ā€“ On-site / Off-Site / Restrictions

  • Conducted on

  • Completed by

  • Location

Site Information

Manager Information

  • Managers Name?

  • Managers Mobile Number?

Site Access

  • Monday to Thursday Opening Time?

  • Monday to Thursday Closing Time?

Site DB Information

  • Office Location?

  • Does site have an Epos DB?

  • Photo of EPoS DB

  • Detail the location of where the DB has been installed

  • Take photos of DB/DBs that are being used for tills/peds

  • Confirm make/model

  • Electrical DB Manufacturer / Model

  • Number of spare ways available in DB

  • Does site require DB upgrade if no spare ways available ?

  • Existing DB supply cable (if upgrade required)

  • Space available to install bigger DB

  • Mains DB location

  • Take a photo of mains DB

  • Electrical DB Manufacturer / Model

  • Number of spare ways available in DB

  • Does site require DB upgrade if no spare ways available ?

  • Existing DB supply cable (if upgrade required)

  • Space available to install bigger DB

Front of House Information

    Tills and Peripherals
  • Location of till onsite (area)?

  • Please confirm if till is front or back bar

  • What Make/Model Till i7

  • Photo of Till and Cash Drawer

  • How many spare USB ports are there on the till ?

  • Take a photo of spare USB ports

  • How many spare comports on till

  • Take a photo of spare comports

  • Number of fixed PEDs associated to this till?

  • Please confirm PED model

  • Can the front bar accommodate power and data points for this tills PED?

  • Take a photo of Ped/s

  • Is the key available for the PED pole

  • Please confirm number of mobile PEDs associated to this till

  • Please confirm mobile PED model

  • Take a photo of PED/s

  • How many spare data are positioned at the till point ?

  • Can you confirm that the spare data is tested and working

  • Please note the data ports that are not testing successfully

  • Please detail the cable route from cab to front of bar

  • Does this till location have enough space to accommodate a new pole mounted PED

  • Where is a suitable location for this PED?

  • Photo of new PED location

  • Detail where the available space is for the PED

  • Take a photo of where the new IP rated box will be installed under the bar

  • Add media

  • Please detail bar material type and shop fitting requirments

  • How many spare power outlets are available at location

  • Is spare power tested to be working

  • Take a photo of spare power outlets

Other Till Locations

  • Does site have any door tills?

  • Photo of till in location

  • When the till is not in use, is it in a secure location?

  • What makes it secure?

  • Do they have a cloak room till?

  • Photo of till in location

  • When the till is not in use, is it in a secure location?

  • What makes it secure?

  • Are there any other work areas or waitress stations that require a PED

  • Detail till and ped requirements, take an image an annotate where PED is required

  • Is a fixed or roaming ped required for this location ?

  • Is there power & data available for a new PED

Office Information

  • Does site have a Comms Cab?

  • What size Comms Cab has been installed?

  • How many ports are available on the patch panel?

  • Photo of Comms cab (With and without the cab door open)

  • Number of spare ā€˜Uā€™ available in existing comms cabinet

  • Comms Cabinet depth (to ensure any new switches will fit)

  • How many switches are in the comms cab

  • Confirm make and model of switches

  • How many free ports are available on the switches

  • Can the cab accommodate a new PED switch?

  • Can a bigger Comms Cab be installed in place of the existing cab?

  • What size cab is required?

  • Photo of new Comms Cab location

  • Will this result in a recable?

  • Detailed explanation as to why?

  • List of data points inside the existing Comms Cab?

  • What size cab will be required?

  • Can it accommodate a new patch panel if this is required alongside the new switch?

  • Can a bigger Comms Cab be installed in place of the existing cab?

  • What size cab is required?

  • Photo of new Comms Cab location

  • Will this result in a recable?

  • Detailed explanation as to why?

  • List of data points inside the existing Comms Cab?

  • What size cab will be required?

  • Is there sufficient power in the cab for the additional PED switch?

  • ***New 6-Way Horizontal PDU will be required***

  • What size cab is required?

  • Photo of new Comms Cab location

  • Will this result in a recable?

  • Detailed explanation as to why?

  • List of data points inside the existing Comms Cab?

Hardware Requirements

Existing PEDs

  • Does site have any RDP Tills/peds

  • How many ?

  • Take photos of all RDPs and peds

  • How many cradles are to be removed from site

  • How many poles to be removed from site ?

Sign Off

  • Is there any additional information from manager regarding site that they wish to feed back ahead of Ped upgrade

  • Manager Signature

  • Manager Name

  • Engineer Signature

  • Engineer Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.