Title Page
-
Site Name
-
BUN Code / Site ID
-
Parking ā On-site / Off-Site / Restrictions
-
Conducted on
-
Completed by
-
Location
Site Information
Manager Information
-
Managers Name?
-
Managers Mobile Number?
Site Access
-
Monday to Thursday Opening Time?
-
Monday to Thursday Closing Time?
Site DB Information
-
Office Location?
-
Does site have an Epos DB?
-
Photo of EPoS DB
-
Detail the location of where the DB has been installed
-
Take photos of DB/DBs that are being used for tills/peds
-
Confirm make/model
-
Electrical DB Manufacturer / Model
-
Number of spare ways available in DB
-
Does site require DB upgrade if no spare ways available ?
-
Existing DB supply cable (if upgrade required)
-
Space available to install bigger DB
-
Mains DB location
-
Take a photo of mains DB
-
Electrical DB Manufacturer / Model
-
Number of spare ways available in DB
-
Does site require DB upgrade if no spare ways available ?
-
Existing DB supply cable (if upgrade required)
-
Space available to install bigger DB
Front of House Information
- Tills and Peripherals
-
Location of till onsite (area)?
-
Please confirm if till is front or back bar
-
What Make/Model Till i7
-
Photo of Till and Cash Drawer
-
How many spare USB ports are there on the till ?
-
Take a photo of spare USB ports
-
How many spare comports on till
-
Take a photo of spare comports
-
Please confirm PED model
-
Can the front bar accommodate power and data points for this tills PED?
-
Take a photo of Ped/s
-
Is the key available for the PED pole
-
Please confirm mobile PED model
-
Take a photo of PED/s
-
How many spare data are positioned at the till point ?
-
Can you confirm that the spare data is tested and working
-
Please note the data ports that are not testing successfully
-
Please detail the cable route from cab to front of bar
-
Does this till location have enough space to accommodate a new pole mounted PED
-
Where is a suitable location for this PED?
-
Photo of new PED location
-
Detail where the available space is for the PED
-
Take a photo of where the new IP rated box will be installed under the bar
-
Add media
-
Please detail bar material type and shop fitting requirments
-
Is spare power tested to be working
-
Take a photo of spare power outlets
Other Till Locations
-
Does site have any door tills?
-
Photo of till in location
-
When the till is not in use, is it in a secure location?
-
What makes it secure?
-
Do they have a cloak room till?
-
Photo of till in location
-
When the till is not in use, is it in a secure location?
-
What makes it secure?
-
Are there any other work areas or waitress stations that require a PED
-
Detail till and ped requirements, take an image an annotate where PED is required
-
Is a fixed or roaming ped required for this location ?
-
Is there power & data available for a new PED
Office Information
-
Does site have a Comms Cab?
- Yes
- No
-
What size Comms Cab has been installed?
-
Photo of Comms cab (With and without the cab door open)
-
Number of spare āUā available in existing comms cabinet
-
Comms Cabinet depth (to ensure any new switches will fit)
-
Confirm make and model of switches
-
Can the cab accommodate a new PED switch?
-
Can a bigger Comms Cab be installed in place of the existing cab?
-
What size cab is required?
-
Photo of new Comms Cab location
-
Will this result in a recable?
-
Detailed explanation as to why?
-
List of data points inside the existing Comms Cab?
-
What size cab will be required?
-
Can it accommodate a new patch panel if this is required alongside the new switch?
-
Can a bigger Comms Cab be installed in place of the existing cab?
-
What size cab is required?
-
Photo of new Comms Cab location
-
Will this result in a recable?
-
Detailed explanation as to why?
-
List of data points inside the existing Comms Cab?
-
What size cab will be required?
-
Is there sufficient power in the cab for the additional PED switch?
-
***New 6-Way Horizontal PDU will be required***
-
What size cab is required?
-
Photo of new Comms Cab location
-
Will this result in a recable?
-
Detailed explanation as to why?
-
List of data points inside the existing Comms Cab?
Hardware Requirements
Existing PEDs
-
Does site have any RDP Tills/peds
-
Take photos of all RDPs and peds
Sign Off
-
Is there any additional information from manager regarding site that they wish to feed back ahead of Ped upgrade
-
Manager Signature
-
Manager Name
-
Engineer Signature
-
Engineer Name